Caption: Board of Trustees Minutes - 1958 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
124 BOARD OF TRUSTEES [October 22 Contract Changes With Whom American Dehydratora Association Commonwealth Edison Co. Institute of Boiler and Radiator Manufacturers Kretschmer Wheat Germ Corp. Northern Illinois Gas Co. Chas, Pfizer and Co., Inc. A. E. Staley Manufacturing Co. United States Air Force A F 33(038)-i8823 (General Electric Co. prime contractor— University of Illinois subcontractor) United States Air Force AF33(6o8)-ri4 United States Atomic Energy Commission AT(II-I)-67, Purpose Unidentified growth factors in alfalfa Criteria for the cathodic protection of lead surfaces in soils and solutions identified as ERC 130 Steam and hot water heating systems and related equipment Wheat germ in physical performance tests Criteria for cathodic protection of ferrous surfaces and hydrogen embrittlement identified as GRP 3 Role of antibiotics in chick nutrition and studies on unidentified growth factors Amino acids and vitamin requirements in swine nutrition Fatigue strength of titanium Amount to be Paid to the University $ 2 500 00 7 700 00 Effective Date August 13, 1956 September i, 1956 August 27, 1956 August 6, 1956 September 1, 1956 24 500 00 2 500 7 700 00 00 1 200 00 July 23, 1956 October 1, 1956 June is, 1956 1 200 00 2 900 00 Instruction of Air Force personnel Radiochemistry study Biochemical processes by which microorganisms and by which Biochemical processes cells engage in synthesis Structural changes in metals due to annealing after deformation Structural changes in metals due to Metabolic pathways concerned in the synthesis degradation of lactose in pathways concerned in Metaboliccell-free systems Metabolism of amino acids labeled with radio active carbon Metabolism of amino acids labeled 3 595 oo1 25 836 00 June 4. 1956 February x. 1956 Project no. 4 United States Atomic Energy Commission AT(i 1-O-67. Project no. 8 United States Atomic Energy Commission AT(i 1-O-67. Project no. 9 United States Atomic Energy Commission ATO1-O-67. Project no. 10 United States Atomic Energy Commission AT(i 1-O-67. Project no. 12 8 500 00 March 1, 1956 23 661 00 January 1, 1956 2 500 00 June 20, 1956 1 25000 July 1, 1956 Adjustment Made in 1953-54 Cost-Plus Contract (Adjustment in project authorized prior to July I, 1956) With Whom Consulting Engineering Service Purpose Three items: $110.29 deduct to $571.71 $ Amount 549 28 Date September 21, 24, and August 24, 1956 Adjustment Made in 1955-56 Cost-Plus Contract (Adjustment in project authorized prior to July 1, 1956) With Whom E. T. Drewitch (Plastering) With Whom Harry F. Fisher (Plastering) Purpose Thirteen items: $225.00 deduct to $205.00 Purpose Twenty items: $11.22 deduct to $559-oo $ Amount 448 02 Date September, 1956 Adjustment Made in 1956-57 Cost-Plus Contract A mount $1 252 96 Date August-September, 1956 T h i s report was received for record. 1 Deduct.
|