UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 768]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 768 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



i95iJ

UNIVERSITY OF ILLINOIS

Amount to be Paid by the University

$ 441 00

865

Date May 29, 1951 June 2i, 1951

With Whom Purpose James L. Lyon Company Installation of accoustical ceiling In Chicago Illini Union Building Banner Construction Co. Construction of concrete sidewalks in designated area on Hermitage Avenue

890 00

Contract Changes

With Whom Enamel Utensil Manufacturers Council International Minerals and Chemical Corp. Julius Hyman and Co.— Shell Chemical Corp. Dawes Manufacturing Co. State of Illinois State of Illinois Purpose Study of enamel standards Study of utilization of phosphorus by plants Study of chlorinated hydrocarbon compounds as insecticides Study of rations for boiler production Study of highway drainage Study of hydraulics of flow at bridges

(1051-1952)

A mount to be Paid to the University S13 367 00

2 500 00 5 0 0 0 00 1 500 00 35 000 00 5 000 00

Date June 6, 1951 June 18, 1951 May 16, 1951 May 9f 1951 February 21, 1951 April 23, 1951

Adjustments Made in Authorizations Issued Under Cost-Plus Standing Contracts

With Whom Anderson Electric Co. Purpose Changes in administrative offices Architecture Building improved lighting Floriculture Building alterations Special state appropriation service building remodeling Remodeling Health Service, Davenport House Horticulture Laboratory remodeling Harker Hall remodeling rooms 104, 1005 West Nevada Street remodeling Sub-total Changes in administrative offices Changes in administrative offices Talbot Laboratory remodeling Bevier Hall remodeling David Kinley Hall remodeling room 226 Talbot Laboratory remodeling Horticulture Laboratory remodeling Harker Hall remodeling rooms 104, 106 1005 West Nevada Street remodeling Sub-total Changes in administrative offices Radiocarbon Laboratory expansion Changes in administrative offices Green Street Apartments Talbot Laboratory remodeling Horticulture Laboratory remodeling Harker Hall remodeling rooms 104, 106 1005 West Nevada Street remodeling Sub-total 708 South Mathews Avenue remodeling Green Street Apartments Talbot Laboratory remodeling Talbot Laboratory remodeling Gymnasium Annex remodeling Special state—East Chemistry Building equipment Horticulture Laboratory remodeling Harker Hall remodeling rooms 104, 106 Special state—East Chemistry Building equipment Sub-total

106

Amount $2 668 78 748 27

450 00 I 074 07 25 00 I 503 43 157 75 I (7 I 3 177 80s 630 948 316 I 643 254 82 12) 18 00 991 I71

Date June 4, 1951 June 15. i9Si

June 22, 1951 June 25, 1951 June 25, 1951 June 26, 1951 June 28, • 951 June 29, • 951 M a y 22, • 95i June 4. 1951 June 7, 195' ] June 12, 1951 June 12, • 95i June 19, 1951 June 26, •951 June 28, • 95i June 29, •951 M a y 22, • 951 M a y 23, 1951 June 5, •951 i June 13, 1951 June 19, • 95" June 26, • 9 5 ' June 28, 1951 June 29, 1951 M a y 12, 1951 M a y 29, M a y 31, June 19, June 20, June 21,

•9Si • 951 •951 • 951 •951

E. N. DeAtley

46>

702 54 4 973 82 3 484 88 I 600 00 14 124 80) 600 00 I 075 00 260 00 385 00 169 09 2 900 00 • 44S 00 2 227 57 (9 061 66) 385 50 • 31 241 00 146 56 I2S 00 4 400 00 944 53 17 421 (6 280 IS)

Reliable Plumbing and Heating Company

Schroeder's

8 7 7J

June 26, 1951 June 28, •951 June 30, 1951

'Deduct.