i95o]

UNIVERSITY OF ILLINOIS

Department Office of Admissions and Records Vendor E. A. Wright Co., Philadelphia, Pa.

31

Cost

2 025 00

Item 4500 (approximately) 8 ^ x 1 1 diplomas printed from steel plate on Crane's parchment deed; names, degrees, and dates to be printed from type (this is the estimated requirement through June, io5*) 6500 8 ^ x 11 blue leather diploma covers 3500 reams 8fijxioH> *4# white mimeograph bond Two Beechcraft Bonanza B-35 airplanes, latest model with standard equipment, to replace one Beech Bonanza A-35 #N752B, less Lear A D F air conditioning unit and one Piper #N4i8sM One generator test bench with accessories Three oil-burning forced circulation warm air furnaces 165,000 B.T.U.'s at the unit 325,000 gallons of No. 5 fuel oil for the Undergraduate Heating Plant at Navy Pier as per Physical Plant specifications Approximately 300,000 gallons No. 1 fuel oil to be delivered as required during the period August 1, 1950, through June 30, 1951, to the Parade Ground Housing Units Three yo* cast iron coal furnaces with controls as specified including removal of old furnaces and installation of new ones (to replace present coal furnaces in T buildings in Illini Village) 1400 tons (estimated requirements) pea size coke to be delivered into bins in Stadium Terrace and Illini Village as required during 19501951 heating sea.son 12,500 tons, 25% more or less, 1 H" or 1 yi" freshly mined Illinois washed screenings for University Power Plant, Chicago, to be delivered as required in accordance with specifications Automobile, model 3116 Suburban Carryall, complete with four-speed transmission, overload springs, 700 x 15 wheels and six-ply tires, heater and defroster, heavy duty grill guard, directional signals, and luggage rack (this automobile to replace a 1949 Chevrolet Suburban Carryall, which was wrecked beyond economical repair) One 1 % cubic yard power wheel special coal bucket (to be used with new clamshell) One Clyde model HPTBT 60 ft. builders tower complete with necessary cables and sheaves and equipped with a model D-140 Le Roi engine, tower derrick, and safety brake 47 day-brite viz-aid fluorescent fixt u r e s : twelve #46203-16, one #46203-8, two #46203-20, thirteen #46203-4, three #4028i-W, two #26140, eleven #46202-16, one #46202-8, two #46202-4

(approximate) f.o.b. Urbana 9 360 00 f.o.b. Urbana 3 080 00 f.o.b. delivered 16 o n 96

Office of Admissions and Records Agricultural Administration Institute of Aviation

W. M. Welch Manufacturing Co., Chicago Bradner Smith & Co., Chicago Rohn Flying Service, Peoria

Institute of Aviation Institute of Aviation Chicago Undergraduate Division, Physical Plant Residence Halls

E. B. Collins Co., Champaign Sears Roebuck & Co., Chicago Hughes Oil Co., Chicago Stewart Oil Co.. Champaign

f.o.b. Kalamazoo, Mich.

1 021 00

f.o.b. delivered 28 762 50 (tax included)

1 171 34

Residence Halls

Acme Coal Co., Champaign

32 865 00 f.o.b. delivered to University tanks 2 384 46 installed

Residence Halls

J. S. Bash & Sons, Champaign

18 760 00 (13-40/

ton)

Chicago Physical Plant, Chicago Coal Storage

Crerar Clinch Coal Co., Chicago

78 875 00 (approximate)

Physical Plant

Songer Chevrolet Sales, Catlin

1 363 50 delivered

Physical Plant Physical Plant

A. E. Hudson Co., Chicago Gil Boers Equipment Co., Chicago Less previous rental charges Net Cost Efengee Electrical Supply Co., Inc., Chicago

I 040 00 f.o.b. factory 4 513 SO

OOP OO

3 613 50 2 432 39 f.o.b. delivered

Physical Plant Storeroom