UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 1377]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1377 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1474

BOARD OF TRUSTEES

[April 24

i l l . Dr. Frank C. Greider, $500 to be added to the research program "Buechele and Greider Postgraduate," in the Department of Surgery. 112. Associates of Mr. Max E. Meyer, in memory of the Meyer's infant son, $22.00 to be added to the Chandler Research Fund in the Department of Orthopaedic Surgery, College of Medicine. 113. William Allen Pusey Fund, $1,200 to be used for the Quine Library of the Chicago Professional Colleges. 114. Estate of Elise Stein, to be designated the Frances Beck Hall Cancer Fund, $6,900 for cancer research in the Department of Surgery, under the supervision of Dr. Warren H. Cole. 115. Mr. and Mrs. W. S. Weber, $5 to be added to Cerebral Palsy Association basic studies, in the Department of Psychiatry, College of Medicine, under the supervision of Dr. A. F. Stein. 116. Mr. Victor S. Yarros, La Jolla, California, $300 to be added to the Rachelle S. Yarros Scholarship Fund, in the College of Medicine. Total, Funds Received from Individuals $9,294.85 C. Gifts of Equipment or of Funds for Equipment 117. Women of the Rotary Club of Chicago, an Albee-Comper fracture table to the Department of Orthopaedic Surgery ($1,500). Total, Gifts of Equipment or of Funds for Equipment $1,500.00 Total, Chicago Professional Colleges $365,062.01 For the Chicago Undergraduate Division 118. Harnischfeger Corporation, Milwaukee, Wisconsin, $100 for scholarships. Total, Chicago Undergraduate Division $100.00 Grand Total $736,58957

This report was received for record.

APPROPRIATION FOR DIXON SPRINGS EXPERIMENT STATION

(20) The operation of the Dixon Springs branch of the Agricultural Experiment Station is financed in part by income from sales of livestock and other products of the experimental program being carried on there. The income has exceeded the budget estimates for the current fiscal year, but expenditures have also been somewhat higher than anticipated. The Director of the Agricultural Experiment Station recommends that $25,000 of excess receipts be appropriated to the Dixon Springs Experiment Station for operating expenses during the current fiscal year. I concur.

On motion of Mrs. Holt, this appropriation was made by the following vote: Aye, Mr. Fornof, Mr. Grange, Mr. Herrkk, Mr. Hickman, Mrs. Holt, Mr. Johnston, Mr. Livingston, Mr. Nickell, Mrs. Watkins; no, none; absent, Mf. Megran, Mr. Stevenson.

CONTRACT FOR REPLACEMENT O F SIDEWALKS AT THE CHICAGO PROFESSIONAL COLLEGES

(21) The Director of the Physical Plant and the Comptroller recommend award of a contract for $2,990 to the Banner Construction Company, Chicago, the lowest bidder, for the construction of new sidewalks from the Medical Center Steam Company plant to the Staff Apartment Building for the Chicago Professional Colleges, now under construction. The old sidewalks were destroyed in the construction of a distribution line from the steam plant to the Apartment Building. Payment will be from funds available to the Physical Plant Department for the operation and maintenance of the steam plant. I concur and recommend that the Comptroller and the Secretary of the Board be authorized to execute this contract.

On motion of Mr. Nickell, this contract was authorized.