UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 1316]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1316 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1952]

UNIVERSITY OF ILLINOIS

1413

UNITS

Required Industrial Education Courses 2 Ed. 488—Curriculum and Trends of Industrial Education 1 Ed. 489—Administration and Supervision of Industrial Education 1 Elective Industrial Education Courses 2 to 4 Ed. 381—Principles of Vocational Education K or 1 Ed. 382—Organization and Administration of Diversified Occupations Programs # Ed. 383—Development, Organization, and Principles of Industrial Education y£ or 1 Ed. 385—Principles and Practices of Vocational Guidance }4 or 1 Ed. 387—Special School-Shop Problems X or I Ed. 481—History and Basic Concepts of Vocational Education 1 Ed. 482—Research Studies in Industrial Education I Ed. 487—Seminar in Industrial Education 1 I concur.

On motion of Mr. Johnston, this program was authorized.

APPROPRIATION FOR ARCHITECTURAL SERVICES ON CONSTRUCTION A N D REMODELING AT URBANA-CHAMPAIGN

(11) The University has been studying the possibility of securing additional space and improving existing space by (a) the construction of an addition to Talbot Laboratory and (b) remodeling of the engine room in the former power plant building on Mathews Avenue for the Physical Environment Laboratory. The Committee on Nonrecurring Appropriations approved the programs in principle and requested the Physical Plant to prepare detailed plans and specifications. The cost of these plans, approximately $6,000 for the Physical Environment Laboratory and $5,600 for the addition to Talbot Laboratory, was charged to the architectural revolving fund in the customary procedure with the expectation that the expenditures would be recovered when the appropriation was approved. Upon the completion of the plans, bids were secured for the addition to Talbot Laboratory and revised estimates of cost prepared for the Physical Environment Laboratory. The funds available in this biennium are not adequate to carry out either project this biennium and further work on both projects must be deferred. The Comptroller and the Provost recommend an appropriation of $11,600 from the General Reserve Fund to reimburse the revolving fund for expenditures incurred. I concur.

On motion of Mr. Fornof, this appropriation was made by the following vote: Aye, Mr. Fornof, Mr. Herrick, Mr. Hickman, Mrs. Holt, Mr. Johnston, Mr. Livingston, Mr. Megran, Mr. Nickell, Mrs. Watkins; no, none; absent, Mr. Grange, Mr. Stevenson.

APPROPRIATION FOR FIRE PROTECTION A N D SAFETY IMPROVEMENTS IN AGRICULTURAL ENGINEERING BUILDINGS

(12) On April 19, 1951, the Board of Trustees appropriated $38,500 from the General Reserve Fund for the installation of a sprinkler system and the construction of a new enclosed stair in the southeast corner of the Agricultural Engineering Building. Bids now received indicate a total cost of $44,500. The additional $6,000 necessary to complete the project can be taken from the state appropriation "For remodeling, modernization, and improvement of existing buildings at Urbana-Champaign." _ The Director of the Physical Plant and the Comptroller recommend that this assignment be made, and that contracts be awarded to the lowest bidders, subject to the release of funds by the Governor and to receipt of authority to begin construction -with the necessary priorities from the National Production Authority, as follows: