1947] UNIVERSITY OF ILLINOIS 227 SCHEDULE B RECOMMENDED PRIORITY SCHEDULE FOR CONSTRUCTION OF CAPITAL ADDITIONS URBANA-CHAMPAIGN: Original Appropriation, 1945-1947 '• 1 576 0 0 0 875 0 0 0 1 102 0 0 0 740 0 0 0 1 150 950 2 600 0 0 0 AAA Priority Chemistry Building Electrical Engineering Laboratory.. Mechanical Engineering Building... Fine Arts Building Residence Halls: Temporary Housing Permanent Staff Apartment Building Power Plant Addition Utilities Distribution System Water Station Improvements Fire Protection Facilities Remodeling Health Service Station. Physics Research Laboratory A A Priority Additional Residence Halls Agricultural Laboratory Building... Band Building Naval Science Building McKinley Hospital Addition Veterinary Building Library Addition Building Modernization Safety Improvements. Health and Sanitary Improvements. Sewer Extensions A Priority Additional Residence Halls for 1,000 Students Health and Physical Educational Building Airport Construction Non-Priority Items Land Contingency (unassigned) Total, Urbana 1 2 3 Additional Appropriation Requested, 1947-1949 $ 400 000 740 000 500 000 550 000 2 300 750 3 713 50 50 ooo 3 000 s ooo 6 000 000 $1 1 1 1 Total 976 ooo 1 615 000 602 ooo1 290 ooo1 802 oso 4 ! 791 0 0 0 / 120 0 0 0 120 0 0 0 75 ooo6 500 0 0 0 3 1 500 ooo 400 000 I 150 950 2 900 OOO3 750 000 5 306 050 170 000 170 000 75 000 1 620 000 1 500 0 0 0: 1 n o 0OO 34o 0 0 0 : 450 ooo 500 1 150 475 500 65 85 60 000 000 000 000 000 000 000 710 0 0 0 220 0 0 0 143 0 0 0 750 0 0 0 315 0 0 0 20 000 60 000 40 000 120 307 500 400 160 500 45 25 20 000 ooo 7 000 000 000 000 000 000 000 3 500 ooo3 2 000 000 1 100 000 3 500 000 2 000 ooo8 1 100 000 127 ooo1 127 000 94 000 94 000 (13 931 000) (17 750 000) (31 681 000) Further increases in costs may render these estimates inadequate. Includes $250,950 from contingencies. To be supplemented by funds obtained through borrowing. * Includes $122,050 from contingencies. 5 Includes $200,000 for Fire Station. 6 Includes $33,000 from contingencies. 1 No allowance made for contribution which may be made by the Navy estimated at $120,000. 3 An estimated additional sum of $3,500,000 will be necessary to complete this building. Consideration is being given to the possibility of securing part or all of this sum through a sellliquidating loan.
|