I956]

UNIVERSITY OF ILLINOIS

IO27

I recommend that this appropriation be made from the General Reserve Fund.

On motion of Mrs. Holt, this appropriation was made by the following vote: Aye, Mr. Bissell, Mrs. Holt, Mr. Livingston, Mr. Megran, Mr. Swain, Mrs. Watkins; no, none; absent, Mr. Herrick, Mr. Johnston, Mr. Nickell, Mr. Stratton, Mr. Williamson.

ADJUSTMENT IN THE BUDGET OF THE DEPARTMENT OF CHEMISTRY A N D CHEMICAL ENGINEERING (13) In the past years, it has been necessary to reduce drastically provision for operating expense and equipment in the budget of the Department of Chemistry and Chemical Engineering. With enrollment increasing and prices rising, the Department is facing a deficit for the year 1955-56 and has drawn extensively on its indirect cost fund. The balance of this fund is necessary for major additions to departmental equipment. In order that the Department may end the fiscal year without overdrawing its accounts, the Provost and the Comptroller recommend a nonrecurring addition of $20,000 to the operating budget of the Department, this appropriation to be from the University's General Reserve Fund. I concur.

On motion of Mr. Livingston, this appropriation was made by the following vote: Aye, Mr. Bissell, Mrs. Holt, Mr. Livingston, Mr. Megran, Mr. Swain, Mrs. Watkins; no, none; absent, Mr. Herrick, Mr. Johnston, Mr. Nickell, Mr. Stratton, Mr. Williamson.

CONTRACTS FOR CONSTRUCTION OF ADDITION TO T H E LINCOLN AVENUE RESIDENCE (14) The Director of the Physical Plant and the Comptroller recommend award of the following contracts for the construction of an addition to the Lincoln Avenue Residence to house 636 women students, the award in each case being to the lowest bidder. General—Felmley-Dickerson Company, Champaign. . . $1 807 000 Less alternate bid for use of galvanized bonderized steel in lieu of copper for roofing, deduct 25 000 ?i 782 000 Electrical—Aschinger Electric Company, Streator 148 773 Plus alternate bids: For lightning protection system if galvanized roofing is used instead of copper, add 1 054 For pneumatic temperature control, add no Less alternate bid for omitting room call system, deduct 13 288 136 649 Plumbing—Robert E. Murphy Company, Chicago 149 425 Heating—Ideal Heating Company, Chicago 69 777 Ventilating—R. H. Bishop, Champaign 31 000 Elevator installations—Long Elevator and Machine Company, Springfield: Electric elevator 20 993 Oildraulic elevator II 416 ™ 32 409 Electric dumbwaiter installation—A.B.C. Elevator Manufacturing Company, Chicago 2 991 Pipe covering—Chicago Pipe and Boiler Covering Company, Chicago 16 890 Temperature control—Johnson Service Company, Milwaukee, Wisconsin 8 084 Less alternate bid allowing for pneumatic controls in lieu of electric controls, deduct 673 7 411 Kitchen and cafeteria equipment installations—Swain and Myers Sales Company, Decatur 101 359 Total $2 329 911