224

BOARD OF TRUSTEES

[September 29

At a hearing before the Committee on Priorities of the Commission held on September 8, the University was requested to arrange its projects in order of urgency. T h e accompanying list of projects, arranged in this manner, was prepared by the Building Program Committee on September 18, approved by President Livingston on September 19, and transmitted to the Commission later the same day. This list, together with corresponding lists from other State agencies, is to be sent soon to all members of the Priorities Committee of the Commission with recommendations concerning appropriate action on the entire program. T h e Priorities Committee will then make its recommendations to the Commission directly or possibly through certain intermediate committees. T h e program will then be ready for consideration by the Legislature. P R O J E C T S FOR F I R S T B I E N N I U M (Arranged in order of urgency) September 18, 1944

Project Priority Project Number 23 24 10

Name of Project

URBANA CAMPUS

Estimated Cost 000 000 000 000 000 000

000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000

1

35 36 34

28 17 1 12

2

7 8 9

10 11 12 13 14 15 16 17

2

9 6

15 16 25 29 26

00 00

3 4 5 6

7 5

Power Plant Addition $ 850 Addition to Distribution Systems (1st stage) 764 Physics Research Laboratory 200 Sewer Extensions (1st stage) 40 Telephone Service Extension (1st stage) 38 Water Station Improvements 120 Remodeling and Modernization of Existing Buildings (ist stage) 500 500 Residence Halls (1st stage) 615 Chemical Engineering Building 740 Fine Arts Building 875 Electrical Engineering Building Health Service Station '. 42 750 Veterinary Building (ist unit) 435 Animal Husbandry Laboratories 100 Chemical Laboratories 233 Mechanical Engineering Laboratories 275 Dairy Husbandry Laboratories 220 Band Building 315 Library Addition (Book Stack Unit) Improvements to Meet Safety Codes (ist stage) 20 National Board of Fire Underwriters Recommendations 120 State Department of Public Health Recommendations 60 Health and Physical Education Building 2 300 Total for Urbana Campus ?I3 112

CHICAGO CAMPUS

1 2

4i 42

3 4

44 43

General Hospital Addition (ist stage) Atmospheric Research Power Plant and Utilities (Distribution System) Land Acquisition (ist stage) Total for Chicago Campus GRAND TOTAL FOR UNIVERSITY

$ 2 000 250 400 250 $ 2 900 $16 012

000 000 000 000 000 000

On motion of Mr. Davis, this list was approved as of September 18, 1944, with the addition (as item 17) of tfie Health and Physical Education Building, $2,300,000, with the understanding that the program is applicable as matters exist at the present time, but without prejudice to other needs and requests of the University.