1940]

UNIVERSITY OF ILLINOIS

63

MANAGEMENT AND OPERATION OF RESEARCH AND EDUCATIONAL HOSPITALS (4b) A Joint Committee representing the Department of Public Welfare and the University has been studying the future management and operation of the Research and Educational Hospitals with a view to the transfer of these responsibilities from the Department to the University. Representatives of this Committee a r e : Department of Public Welfare University of Illinois

Director A. L. BOWEN Doctor MAJOR H . WORTHINGTON Mr. CHARLES H . SCHWEPPE Mr. JOHN C. WEIGEL Dean R. B. ALLEN J u d g e SVEINBJORN JOHNSON Director C. S. HAVENS Mr. LLOYD MOREV

This Joint Committee submits a report of its first meeting held in Chicago on September 24. It is a report of progress rather than a statement of complete and final recommendations, but is submitted for the information of the Board of Trustees and for any instructions the Board may wish to give its representatives. Copies of this report were sent to the special Board committee consisting of Dr. Karl A. Meyer, Mrs. Glenn E. Plumb, and Messrs. James M. Cleary and Oscar G. Mayer.

On motion of Dr. Meyer, this matter was made a special order of business for the next meeting of the Board.

BIDS O N FOOD SERVICE EQUIPMENT FOR MEN'S RESIDENCE HALL IN URBANA AND UNION BUILDING IN CHICAGO (47) T h e following schedule of bids have been received on food service equipment for the Men's Residence Hall in Urbana and the Union Building in Chicago:

BID SCHEDULE—MEN'S RESIDENCE H A L L K I T C H E N EQUIPMENT Alternate Alternate Proposal No. lA No. iAA Proposal Proposal No. i (Deduct ) (Deduct) No. 2 No. 3

Optional Alternate Proposal Bidders No. j A No. 4 Duparquet, Inc., 225 N. Racine Ave., Chicago £15 943 42 $470 00 $200 00 $ 1 050 00 $2 200 00 Mid-State Engineering Co., Champaign $2 091 00 $— 30 00 Southern Equipment Co., 5017 S. 38th St., St. Louis 16 682 00 497 00 iSS 00 2 320 00 The S t e a r n e s C o . , 1333 S. W a b a s h Ave., Chicago. . . . 16 295 00 481 00 192 00 1 142 00 2 360 00 Proposal No. 1—Furnishing and installing of all kitchen equipment. Alternate No. lA—In the event stainless steel table tops are changed to galvanized, deduct. Alternate No. iAA—In the event stainless steel lining is omitted in tray and glass stands, deduct. Proposal No. 2—Furnishing and installing of all refrigerators and milk chests. Proposal No. 3—Furnishing and installing of all compressors, coils, refrigerator shelving, etc. Alternate No. 3A—In the event items specified under Proposal No. 3 are changed, add or deduct. Proposal No. 4—Furnishing and installing of all storage racks, kitchen cabinets, etc.

Mr. Havens presented this matter and recommended that the contract for items i, 2, and 4 be awarded to Duparquet, Inc., on the basis of their bid of $15,943; and that item 3 be awarded to the Mid-State Engineering Company on the basis of their bid of $2,091. On motion of Mrs. Plumb, these awards were authorized.