Caption: Board of Trustees Minutes - 1942 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
IO BOARD OF TRUSTEES SCHEDULE OF BIDS—MEN'S RESIDENCE HALL HEATING, VENTILATING, AND T E M P E R A T U R E CONTROL [July 17 {Continued) Bidders Base Bid #1 Deduct Alternate #2 $3 Add Add Proposals* #4 #5 Add Add or Deduct Phillips, G e t s c h o w C o . , 32 W . H u b b a r d St., C h i c a g o $49 500 $400 $275 $4 200 $2 0 0 0 $2 200 D e d u c t F r e d W h i t e , 116 N . 16th St., Mattoon 51 0 6 8 357 o 4857 2 768 126 A d d M e h r i n g & H a n s o n , 162 N . Clinton St., Chicago. . . . 51 806 240 352 4670 1 206 800 D e d u c t C a r s o n - P a y s o n C o . , 616 N . Jackson St., Danville. . . 52617 350 360 5245 o 450 A d d *jPi—Omission of heating and ventilating work in west ends of basement of north and south units. $2—Using recessed convectors and concealed risers, as in original specifications. #3—Install all Dunham control omitted, thereby furnishing a complete zone control system. #4.—Same as Alternate #3, except substitute Johnson Service Co. system. #5—Use of welded construction as originally specified. ELECTRIC WORK Bidders Base Bid Alternate Proposals* (Deduct) #1 #2 $375 115 194 401 200 280 385 f, 79 190 138 120 310 240 425 P o r t e r , Glore, & G l a s s , I n c . , 215-219 H u d s o n S t . , Indianapolis, Ind $26 642 F r e e m a n , E r n e s t & C o . , 608 S. D e a r b o r n St., C h i c a g o 2 7 3 1 5 N e w g a r d , H e n r y & C o . , 549 W a s h i n g t o n S t . , C h i c a g o 27 494 A n d e r s o n E l e c t r i c C o . , 613 C o l l e t t St., D a n v i l l e . . . 27 499 D i v a n e Bros., 3826 V a n B u r e n St., C h i c a g o 28 130 Hoffman E l e c t r i c C o . , 2525 W . V a n B u r e n St., Chicago 28 188 K o e n e m a n , E . A., E l e c t r i c C o . , 1408 D e l r a a r B l v d . , St. Louis, M o 31 468 *#i—Omission of electric work in west ends of basement of north and south units. #2—Omission of all breakers and cable in connection with attic ventilation fans, circuits 23, 30, and 28. PLUMBING WORK D;J]_. m M c r s Base Bid Alternate mi £644 00 946 14 500 0 0 Proposals* (Deduct) #2 #3 # $103 00 32 00 88 50 4 W h i t e , F r e d , 116 N . 16th St., Mattoon $49 778 00 Leifer, A., P l u m b i n g , 4544 N . Western Ave., Chicago 53 156 73 C a r s o n - P a y s o n Co., 616-618 N . J a c k s o n St., D a n v i l l e 54 792 00 $ 4 5 3 00 419 20 3 3 5 00 $904 00 790 00 790 00 *H—Omission of plumbing fixtures and roughing-in in Toilet Rooms 23 and 87. fz—Omission of all fixtures and trimming, leaving roughing-in only in Rooms ir, ir-A, 81, and 81-A. #3—Omission of eight downspout connections to connecting arcades between buildings. #4-—Omission of automatic feature of water softener, substituting hand-operated multi-port valve.
| |