8

BOARD OF TRUSTEES

[July

IJ

SECOND SESSION, JULY 17, 1940 When the Board convened after the recess on July 17, 1940, the following members were present: President Pogue, Mr. Cleary, Mr. Jensen, Mr. Mayer, Mrs. Plumb, Mr. Wieland, Mr. Williamson. President Willard was present; also Mr. Janata, Judge Johnson, Mr. Morey, Mr. Havens, Mr. Stouffer, Dean C. M. Thompson, President of the University of Illinois Foundation, and the Secretary.

MATTERS PRESENTED BY PRESIDENT WILLARD

The Board considered the following matters presented by the President of the University.

BIDS ON RESIDENCE HALL FOR MEN (1) Bids received July I and 3 on the proposed Residence Hall for Men are in excess of funds available for this project, the aggregate of the lowest bids being $843,000, against a building budget of $600,000. Consequently all bids were rejected, and addenda to the original plans and specifications, reducing the amount of construction originally contemplated, were sent to all bidders with a request for revised bids on July 16, 1940, for consideration by the Board on July 17. Director C. S. Havens of the Physical Plant Department has submitted a statement giving reasons why the bids are in excess of the estimated cost and discussing various alternatives which may be considered by the Board.

On motion of Mr. Cleary, the action of the President in rejecting the original bids and calling for revised bids was confirmed. Director Havens presented schedules of bids and comparative budgets for the construction of the Men's Residence Hall.

COMPARATIVE B U D G E T S — M E N ' S RESIDENCE H A L L

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Original1 General $498 800 Elevator 5 272 Electrical 29 298 Plumbing 47 299-1 Heating and ventilating 57 158/ Light fixtures and lamps 6 500 Hardware 12 500 Window shades and Venetian blinds I 800 Landscaping 5 500 Food service equipment (including dining room) 42 072 Furnishings for student rooms, lounges, game r o o m s . . . 62 253 Architectural, engineering, and supervision 32 000 Financing costs 27 800 Contingent fund 14 748 Totals $843 000

Revised1 J401 133 4 934 26 642 , „ y ' 6 000 11 000 1 200 30 49 32 27 10 $696 020 205 000 800 000 714

•Amounts shown for items 1-5 represent bids received; those for items 6-14 are estimates.