UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 81]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 81 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



78

BOARD OF TRUSTEES

[July 26

12. MisceHaneous neuropsychiatric facilities, rehabilitation to improve patient care areas 13. Remodeling the space vacated by the Animal Hospital . . . U. Old Dentistry-Medicine-Pharmacy Building, remodeling and rehabilitation of classrooms 15. Department of Dermatology, remodeling; 16. Dietary Kitchen, remodeling and rehabilitation 17. East Dentistry-Medicine-Pharmacy Building, remodeling basement locker room 18. Locker rooms and medical records filing area in the basement of the east wing, remodeling 19. Orthopaedic Building, remodeling the second and fourth floors for offices anil laboratories 20. Orthopaedic Building, remodeling the basement, second and third floors 21. Space for a radioisotopes receiving station recommended by the radioisotopes safety committee Minor Structures Drug and Horticnltural Station, construction of facilities Schedule C —1961-63 Biennium Utility Distribution and Power Plant — Urbana-Chaiupaign and Chicago Professional Colleges Appropriation request $4,930,000. Steam demands from existing facilities on the campus are now in excess of the firm capacity of the plant. In the event of severe weather conditions, it will probably be necessary to reduce temperatures in buildings and perhaps to curtail the use of steam in certain areas entirely. The electric demands from existing facilities and buildings now under construction will also exceed the firm capacity of the power plant by about January, 1%1. Although funds were provided in the 1959-61 biennium to offset this difficulty, they have not yet been released and the University is making plans for the purchase of power nntil additional generating equipment can be installed. The additional buildings recommended for construction during 1961-63 will require additional capacity of the power plant and major extensions of the utility distribution system. At the Chicago Professional Colleges, increased electrical capacity must \x provided for the old Dentistry-Medicine-Pharmacy Building. Also included is the replacement of telephone cables which cost will be amortized in approximately three and one-half years. The appropriation requested will provide for: 1. Power Plant Addition a. Boiler plant — 300,000 Ibs/hr $ 4 000 000 b. Electrical plant —7500 KW..., 2 100 ( O W 2. Extension of the utilities distribution system 4 930 000 3. Extension of electrical distribution system and replacement of telephone cable (Chicago Professional Colleges) 300 00(1 Total . $11 330 000 Less funds to he included in 1959-61 appropriation schedule to be reappropriatcd 6 400 000 Total Requested 1961-63 Biennium $ 4 930 000 Schedule D —1961-63 Biennium Land Acquisition — Urbann-Champaign Appropriation request $2,930,000, The construction of a major building requires approximately two years to complete. However, it is necessary to acqnire the land which will serve as a site prior to the biennium in which the construction is to be started. Additional land is required for buildings, both academic and housing, for parking, and to replace land to be released by the College of Agriculture when it is required by Campus expansion. In addition to the need to provide funds for the purchase of land for sites of buildings to be constructed in 1963-65, some funds should also be available when certain parcels of land are offered for sale. Purchases made at such times result in lower acquisition costs and make possible interim use by the University.