UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 478]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 478 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1961 ]

UNIVERSITY OP ILLINOIS

475

Additive Alternate: for reconstruction of sidewalks on north side of John Street required because of underground utilities installations 1 750 Electrical — Cunningham Electric Company, Anna 109 735 plumbing— H. P. Reger and Company, Chicago 42 500 Heating — Ideal Heating Company, Chicago..- ; 159 333 Ventilating—R. H. Bishop Company, Champaign 54 360 Total Contract! ?I 035 178 Funds will be available for the construction of the Student Services Building from the proceeds of the revenue bonds which are being sold today. Submitted herewith is a report from the Physical Plant Department on this project, including a schedule of the hids received, a copy of which is being filed with the Secretary of the Board for record. I concur. On motion of M r . Clement, these contracts were awarded, as recommended, by the following vote: Aye, Mr. Clement, M r . Dilliard, M r . Harewood, M r . H u g h e s , M r . Pogue, Mr. Swain, M r s . Watkins, M r , VViliiamson; no, n o n e ; absent, Mr. Johnston, Mr. Kerner, Mr. Wilkins.

CONTRACTS FOR CONSTRUCTION O F PHYSIOLOGY RESEARCH LABORATORY

(13) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of the following contracts for the construction of a Physiology Research Laboratory on the University's south farm, east of First Street and south of St. Mary's Road, the award bi each case being to the lowest bidder: GtDcra) — A. F. Krall Construction Company, Inc., Decatur $ 35 238 Base Bid $ 33 572 Additive Alternates; Ceramic tile walls in operating room and wash room,... 976 Quarry tile floor in operating room 690 Electrical — Brunkow Electric Company, Champaign 8 438 Base Bid ... $ 7 588 Additive Alternate: for lightning rods on building 850 Plumbing—David W. Reichard Plumbing and Heating, Urbana 9 200 Base Bid . % 7 300 Additive Alternate: for a still and associated piping to provide distilled water for research work 1 900 Heating and Ventilating (combined contract) — Nogle and Black, Inc., Champaign 6 213 Heating $ 4 958 Ventilating 1 2S5 _____ Total Contract $ 59 089 Funds for this project are available in the following grants: National Institutes of Health Grant No. RC 618 $ 4 0 000 Moorman Manufacturing Company Grant 40 000 $ 80 000 .Submitted herewith is a report from the Physical Plant Department on this Project, including a schedule of the bids received, a copy of which is being filed with the Secretary of the Board for record, I concur. On motion of M r s . W a t k i n s , these contracts were awarded, as recommended, by the following vote: Aye, M r . Clement, Mr, Dilliard, Mr. Harewood, M r . Hughes, M r . Pogue, Mr. Swain, M r s . W a t k i n s , Mr. Williamson; no, none; absent, M r . Johnston, Mr. Kerner, Mr.

W 1*11