474

BOARD OF TRUSTEES

(May [7

Submitted herewith is a report from the Physical Plant Department on (his project, including a schedule of the bids received, a copy of which is being fifed with the Secretary of the Board for record. I concur and recommend an appropriation of $363,000 be made from the General Reserve Fund for this project. O n motion of Mr. Swain, these contracts were awarded, as recommended, by the following vote: A y e , Mr. Clement, M r . Dilliard, Mr. H a r e w o o d , Mr. Hughes, M r . Pogue, Mr. Swain, M r s . Watkins, Mr, Williamson; no, none; absent, M r . Johnston, M r . Kerner, Mr. Wilkins.

CONTRACTS FOR CONSTRUCTION OF PENNSYLVANIA AVENUE RESIDENCE HALLS

(11) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of contracts as follows for the construction of the Pennsjlvania Avenue Residence Halls for Women in the area at the southwest comer o f Pennsylvania and Lincoln Avenues in Urbana, The award in each case is to the lowest bidder. General — Kuhne-Simmons Company, Inc., Champaign $3 064 065 Base Bid $3 069 900 Fee for supervision of other contractors 34 165 It is recommended that all mechanical contractors be assigned to the general contractor who will assume responsibility for the supervision and quality of their work, thus making the mechanical contractors subcontractors of the general contractor. Deductive Alternate: substitution of air-dried blocks for steam-cured as specified; air-dried blocks have been used in connection with Urbana construction,,, —40 000 Electrical — Cunningham Electric Company, Anna 303 1 0 0 Base Bid ? 288 800 : Additive Alternate: provision of two additional electrical convenience outlets in each study room throughout the building 14 300 Plumbing—Nu-Way Plumbing Service, Inc., Chicago 3W 000 Heating — Economy Piping Contractors, Inc., Skokie 538 860 Ventilating — Montefusco Heating and Sheet Metal Company, Peoria.. 144 OT Kitchen Equipment — Kuhne-Simmons Company, Inc., Champaign 225 21S Total Contracts $4 670 142 Funds will be available to finance the construction of these halls from the proceeds of the revenue bonds which are being sold today. Submitted herewith is a report from the Physical Plant Department on this project, including a schedule of the bids received, a copy of which is being filed with the Secretary of the Board for record. I concur in these recommendations. O n motion of Mr, Swain, these contracts were awarded, as recommended, by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Harewood, M r , Hughes, Mr, Pogue, M r . Swain, M r s . Watkins, Mr. Williamson; no, none; absent, M r . Johnston, M r . K e r n e r , Mr. Wilkins.

CONTRACTS FOR CONSTRUCTION O F STUDENT SERVICES BUILDING

(12) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of the following contracts for construction of a Stude™ Services Building on the north side of John Street immediately west of I1^D) Hall in Champaign to provide quarters for relocation of the Office of the D*M of Students and various subdivisions of that office, and for the Student Counseling Service. The award in each case is to the lowest hidder. General — Kuhne-Simmons Company, Inc., Champaign $ 669 2U 5 Base Bid $667 500