UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1096]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1096 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1961]

UNIVEHSITY OF ILLINOIS

1093

Research and Educational Hospitals addition, install exit door .,...,.. $ 1 650 Campus protective lighting 1 171 Research and Educational Hospitals, Radiology, install 2 100 communication system Dentistry-Medicine-Pharmacy Building, air condition room 165 1 355 Pathology, install washer 950 Minor estimating unassigned 295 Hospital Residence, sign 340 500 Pharmacology, remodeling room 407 500 Dentistry, bulletin board Dental Admissions, partition 500 Room 408, install 220 volt line 450 Research and Educational Hospitals, partition room 2 1 . . 475 Room 258, install window air conditioner 500 Research and Educational Hospitals, eighth floor, estimate 300 87 of germ free environment (101 Total, Chicago Professional CoUegvs Chicago Under graduate Division General administration and expense 2 009 Art gallery 137 I 808 Auditorium expense 3 572 Radioisotope 1 627 Liberal Arts and Sciences Engineering Graduate College Commerce and Business Administration Physical Education Armed Forces Library Physical Plant 37 8191 Regular operation and maintenance 33 4 157 Bunding rentals and insurance Unexpended plant 174 Office of the Dean, special equipment 073 Engineering and Architecture, remodeling 900 Biological Laboratory, remodeling 398 Lecture room, remodeling 1 064 Admissions and Records, air conditioning Library, remodel rooms 39, 40, and 42, and area 332 1 556 16 500 Remodel rooms 113, 120 and 132 Total, Chicago Undergraduate Division (26 $1 776 Grand Total

141 435}

581 443» 723 1 678 2071 793' 500 5121

662'

665 916) 1 708

CONTRACT FOR ADDITION TO ABBOTT POWER PLANT (12) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of a contract for $26,202 to Spnnkmann Sons Corporation of Illinois, Peoria, the lowest bidder, for thermal insulation (Division "8-Q") in the construction of an addition to the Abbott Power Plant. Funds for this are provided in the state capital appropriations to the University for 1961-63 to be available in the proceeds of the Universities Building Fund and are subject to release by the Governor. I recommend authorization of this contract, subject to availability of funds.

On motion of Mr. Johnston, this contract was authorized by the following vote: Aye, Mr. Clement, Mr. DilHard, Mr, Harewood, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Wilkins, Mr. Williamson; no, none; absent, Mr. Kerner.

ADDITION TO CONTRACT FOR CONSTRUCTION O F ASSEMBLY HALL (13) The Vice-President and Comptroller and the Director of the Physical Plant

1

Deduct.