720

BOARD OF TRUSTEES

[September 20

CONTRACTS FOR REMODELING IN NOYES LABORATORY FOR T H E DIVISION OF CHEMISTRY, URBAN A (13) The Director of the Physical Plant and the Vice-President and Comptroller recommend assignment of $157,280 from the Urbana-Champaign Contract Research Reserve and award of the following contracts, based on the percentages bid for contractors' fees, for remodeling twenty-five rooms in portions of the first, second, third, and fourth floors of Noyes Laboratory for the Division of Chemistry of the College of Liberal Arts and Sciences, Urbana-Champaign, the award in each case to the lowest bidder: D „ ,,„, Cgnt Per Cent Estimated Per Cent pef Total for for SubFee Estimated for contracts Payments Labor Payments Material General — Dean Evans Co., Champaign 4 25 12 $27 220 00 $223 220 00 Electrical — G. L. Wilsky, an individual doing business as Downtown Electric, Urbana 15 22 6 500 00 42 500 00 Plumbing —- Wren C. Thomas and Willis H. Thomas, a partnership doing business as Thomas Plumbing and Heating Company, Urbana 15 38 13 540 00 59 540 00 Heating, Piping, Refrigeration and Automatic Temperature Control Systems — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 25 35 10 12 100 00 54 200 00 Ventilation and Distribution Systems for Conditioned Air — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 25 30 10 19 600 00 89 600 00 Remaining funds for the worli are available from a National Science Foundation Grant ($200,000) and from a previous allocation approved by the Board of Trustees on April 19, 1967. Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. I concur.

On motion of Mr. Swain, these recommendations were approved by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Page, Mr. Pogue, Mr. Swain; no, none; absent, Governor Kerner, Dr. Weatherly.

CONTRACTS FOR REMODELING IN NOYES LABORATORY FOR T H E DEPARTMENT OF ZOOLOGY, URBANA (14) The Director of the Physical Plant and the Vice-President and Comptroller recommend assignment of $53,280 from the Urbana-Champaign General Reserve and award of the following contracts, based on the percentages bid for contractors' fees, for remodeling four rooms in Noyes Laboratory for the Department of Zoology, Urbana-Champaign, the award in each case to the lowest bidder: Per Cent Per Cent Per Cent Estimated Total for for for SubFee Estimated contracts Payments Payments Material Labor General — Barber & DeAtley, 10 $3 500 00 $31 500 00 Inc., Urbana 5 25 Electrical — G. L. Wilsky, an individual doing business as 418 00 2 618 00 Downtown Electric, Urbana. . 16 23