Remodeling the Coordinated Science Laboratory basement for a photofabrication facility for the College of Engineering. 22 215 Total, Urbana-Champaign Contract Research Reserve-General $59 085 Medical Center The Chancellor, on behalf of the Medical Center Committee on Nonrecurring Appropriations, recommends the following appropriations from the: Medical Center General Reserve Renovation and remodeling for which funds are assigned to the Physical Plant Department: Air conditioning the computer space in the Medical Sciences Addition for the Research Resources Laboratory $14 200 Extension of air-conditioning system from the Medical Sciences Addition to the Illinois Surgical Institute Building 25 000 Total, Medical Center General Reserve $39 200 The Executive Vice President and Provost and the Vice President and Comptroller concur. I recommend approval of these appropriations. O n m o t i o n of M r . H a h n , t h e s e a p p r o p r i a t i o n s w e r e m a d e b y t h e following v o t e ; A y e , M r . Clement, M r . Grimes, M r . H a h n , M r . H u g h e s , Mr. Jones, M r . Steger; no, none; absent, Governor Ogilvie, M r . P a g e , Mr. Stone, M r . Swain. CONTRACTS FOR REMODELING IN NATURAL HISTORY BUILDING, URBANA CAMPUS (12) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts based on percentages bid for contractors' fees for remodeling Room 158 in the Natural History Building, Urbana, for the Department of Geology, the award in each case being to the low bidder. Estimated Fee PayPer Cent Per Cent Per Cent ments and Total for for for Sub- Equipment Estimated Material Labor contracts Costs Payments General — Skoog Construction Company, Champaign 5 29 1 $ 547 00 $2 547 00 Electrical — Remco Electrical Corporation, Champaign... 6.8 25 0 447 00 3 677 00 Plumbing — Reliable Plumbing & Heating Company, C h a m p a i g n . . . 20 45 5 1 040 00 4 340 00 Heating, Piping, Refrigeration and Automatic Temperature Control Systems Work — Reliable Plumbing & Heating Company, Champaign. . . 20 45 5 1 972 50 5 772 50 Ventilation and Distribution Systems for Conditioned Air Work — Reliable Plumbing & Heating Company, Champaign 20 50 5 1 2 9 0 00 4 690 00 Since Reliable Plumbing & Heating Company, Champaign, is the low bidder for plumbing work and for heating, piping, refrigeration and automatic temperature control systems work, with identical fee percentages, it is recommended that these two awards be combined in a single contract instead of separate contracts.