346

BOARD OF TRUSTEES

[Juty 21

Table I. Chicago Circle Campus: Capital Request for F Y 1973 Classified List of Projects* Total Project Request 1. Buildings, Additions, and/or Structures •Architecture and Art Laboratories Addition $ 9 876 100 Subtotal, Buildings, Additions, and/or Structures. (9 876 100) 2. Funds to Complete IB A Buildings FY 1970 Projects •Classroom Office — Student Services Building 45 600 • Library Addition, Phase I V . 73 800 • Science and Engineering (Engineering and Classrooms) 64 400 • Plant Research Laboratory Addition 19 300 • Power Plant Addition 7 000 FY 1973 Projects • Architecture and Art Laboratories Addition 33 000 Subtotal, Funds to Complete IBA Buildings ( 243 100) 3. Land • Site for Performing Arts Center 4 110 000 Subtotal, Land (4 110 000) 4. Equipment • Classroom Office — Student Services Building 672 800 • Library Addition, Phase I V 348 000 • Science and Engineering (Engineering and Classrooms) 2 055 800 • Plant Research Laboratory Addition 74 100 • Equipment for Remodeling Projects 53 900 • Architecture and Art Laboratories Addition 74 000 • Science and Engineering South 2 500 000 Subtotal, Equipment (5 778 600) 5. Utilities • Extend Present System to Classroom Office-Student Services Building ..... 864 000 • 16" Water Main for Science and Engineering (Engineering and Classrooms) 100 000 • Correction to Lecture Air Intake Shaft 44 000 Utilities Relocation for Architecture and Art Laboratory Addition 20 000 Subtotal, Utilities (1 028 000) 6. Remodeling and Rehabilitation •Conversion of Burnham Hall Laboratories to Classrooms 147 500 • Conversion of Addams Hall Laboratories to Classrooms 40 000 • Racine Avenue Building 453 800 • Building Equipment Automation, Phase 1 243 000 Hull House Humidification 14 000 Improvement of Lighting Levels in the Lecture Center 39 000 • Manhole Drainage for 12000 Volt Electrical Distribution System.. 49 000 Interior Graphics 30 500 • Safety Valves for Heating System, Phase 1 60 000 Subtotal, Remodeling and Rehabilitation (1 076 800) 7. Site Improvements • L i g h t i n g Drives and Walks (Classroom Office-Student Services Building) 57 000 • Lighting Drives and Walks (Library, Phase I V ) 170 000 • Shelters — Bus Stop Protection 25 000 Replacement of Lost Parking Spaces 157 600 • General Landscaping 42 500 • Development of Playing Fields — Roosevelt Road Area, Phase I . . 691 000 Subtotal, Site Improvements (1 143 100)

ft Projects preceded by an asterisk were approved by the Board of Higher Education for FY 1972, but were deferred. The amounts for FY 1973 are often different from FY 1972 figures for various reasons: cost increases, changing requirements, changes in the scheduling of cash-flow n^eds for projects requiring funding over two or more fiscal years, and changes in the policy of the Illinois Building Authority as to funding for equipment.