Caption: Board of Trustees Minutes - 1972 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
330 BOARD O F T R U S T E E S [June 16 approved by him on recommendation of the Directors of Purchases in amounts of $5,000 to $7,500. A copy of this report is filed with the Secretary. This report was received for record. COMPTROLLER'S MONTHLY REPORT OF CONTRACTS EXECUTED (35) The Comptroller's monthly report of contracts executed was presented. Chicago Circle Change Orders With Whom United States Navy N00014-69-A-0090-0002 Total With Whom E. H. Marhoefer, Jr. Co. Purpose Coast pattern recognition Amount to be Paid to the University $ 14 305 t 14 305 Purpose Underground utilities tunnel extension—Relocation of electrical and telephone manholes: Behavioral Science Building Undergroundutilitiestunnel extension—Watertight seal at utility tunnel joints: Physical Education Building Amount to be Paid by the University t 6 635 10 400 $ 17 035 Total Urbana-Champaign New Contracts Purpose Upward bound program With Whom United States Department of Health, Education, and Welfare OEG-O-71-2668 United States Navy N00014-71-C-0236 Total Amount to be Paid to the University $ 89 103 Computer methods in structural mechanics 37 000 S126 103 Amount to be Paid to the University $ 6 800 37 995 6 000 Change Orders Purpose Air conditioning systems investigation Local pressure field in turbulent shear flow and its relation to aerodynamic generation Silicate treatment to inhibit corrosion of hot potable water systems With Whom Air Conditioning and Refrigeration Institute National Aeronautics and Space Administration NGR 14-0OS-149 United States Air Force F29601-69-C-0071 United States Department of Health. Education, and Welfare: OEG-0-9-230330-443S OEG-O-7O-2055(725) OEG-5-9-230306-O055 Total Effects of personality, motivation, and reward on the learning of high school students T T T project in English and mathematics education Critique of research studies in music education 212 460 96 000 8 458 $367 713 Amount to be Paid by the University $ 16 000 7 000 9 000 8 500 24 972 8 400 With Whom D. W. Reichard Plumbing and Heating Co., Inc. Dean Evans Company Purpose Cost plus—Ventilation and distribution systems: Remodeling of vent system at the Armory Cost plus—General work: Repairing, tuckpointing, and caulking exterior walls of the Natural History Building^ Reroofing of fiatroof over Boneyard section of Electrical Engineering Research Laboratory Remodeling of 1001 West Nevada, Urbana Construction of a wood frame cage layer house Tuckpointing required in the "mask ' grouting of Talbot Laboratory Total t 73 872
|