EXTRACTED TEXT FROM PAGE:



1971]

UNIVERSITY OF ILLINOIS

323 Per Cent for Subcontracts 6

General — Tal Rauhoff, Inc., Chicago Plumbing — The Nu-Way Contracting Corp., Chicago.......... 8 30 1 Heating, Refrigeration, and Temperature Control — T h e Nu-Way Contracting Corp., Chicago 8 30 1 Ventilation and Distribution Systems for Conditioned Air — Davron Engineering Co., Inc., Melrose P a r k 10 33.5 5 Electrical — Fries Walters Co., Chicago 10 30 5 These contracts will be for work on projects estimated to cost less than $25,000. The several contractors bid on percentages to be added lo an estimated volume of material, labor, and subcontractors, and the awards recommended are to the low bidders. The work will be done as ordered by the Physical Plant Department and will be paid for on the basis of the actual cost of each job plus the contractors' fees. Submitted herewith is a report of the Office of Physical Plant Planning and Construction. A copy of the report and a schedule of bids received have been filed with the Secretary of the Board for record. No assignment of funds is requested as each job will be covered by a contract change order charged against funds allocated for each project. It is further recommended that the Vice President and Comptroller be authorized to approve change orders under these contracts up to $25,000 on each project. O n m o t i o n of M r . S w a i n , t h e s e c o n t r a c t s w e r e a w a r d e d a n d a u thority w a s given as r e c o m m e n d e d by the following vote: Aye, M r . Forsyth, M r . Grimes, M r . H a h n , Mr. H o w a r d , M r . H u g h e s , M r . Neal, M r . P o g u e , M r . S w a i n ; no, n o n e ; absent, D r . Bakalis, G o v e r n o r Ogilvie, M r . Steger. CONTRACTS FOR REMODELING IN SECOND UNIT DENTISTRYMEDICINE-PHARMACY BUILDING, MEDICAL CENTER (22) T h e President of the University, with the concurrence of appropriate administrative officers, recommends award of the following contracts for remodeling a portion of the third floor of the Second Unit Dentistry-Medicine-Pharmacy Building at the Medical Center campus for the Center for Education and Research in Genetics of the School of Basic Medical Sciences, the award in each case being to the low base bidder: General — James Drew, an individual doing business as J. S. Drew Construction Co., Palatine $ 9 589 Plumbing — G. F . Connelly Co., Inc., Chicago 3 650 Heating, Process Piping and Temperature Control — G. F. Connelly Co., Inc., Chicago 2 712 Electrical — H y r e Electrical Company, Chicago 4 900 Laboratory Furniture — American Hospital Supply Corporation, through its Division, Hamilton Manufacturing Company, Two Rivers, Wisconsin 12 677 Total $33 528 It is further recommended that all contracts other than the contract for the general work be assigned to the contractor for the general work, making the total of its contract $33,528, and that an agreement be entered into with James Drew for assignment of the other contracts. The amount bid by James Drew for the supervision of the other contracts assigned to the general contractor is included in the base bid for general work. Funds for this work are available in the Contract Research Reserve and United States Government Grants. Submitted herewith is a report from the Office of Physical Plant Planning

Per Cent for Materiai 8

Per Cent for Labor 31