BOARD OF TRUSTEES

[July 22

Funds are available in state capital appropriations to the University and have been released by the Governor. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. O n motion of M r . Swain, these contracts were awarded by the following vote: Aye, Mr. Clement, M r . Grimes, M r . H a h n , M r . H u g h e s , M r . Stone, M r . Swain, D r . W a l k e r ; no, n o n e ; absent, M r . Jones, Governor Ogilvie, M r . Page, M r . Steger.

CONTRACTS FOR REMODELING IN ILLINOIS SURGICAL INSTITUTE, MEDICAL CENTER

(26) The President of the University, with the concurrence of appropriate administrative officers, recommends the award of the following contracts for remodeling the Orthopedics Ward, second floor, Illinois Surgical Institute at the Medical Center campus, the award in each case being to the low base bidder: General — B. W. Handler Construction Co., Chicago $111 983 Plumbing — Delta Piping Co., Chicago 26 500 Heating and Process Piping — Delta Piping Co., Chicago 28 073 Ventilation — Moto Heating, Ventilating, Air Conditioning Corporation, Chicago 5 745 Electrical — C & H Electric Co., Chicago 27 922 Total $200 223 It is further recommended that all contracts other than the contract for the general work be assigned to the contractor for the general work, making the total of its contract $200,223, and that an agreement be entered into with the B. W. Handler Construction Co. for the assignment of the other contracts. The amount bid by the B. W. Handler Construction Co. for the supervision of the other contracts assigned to the general contractor is included in the base bid for the general work. Funds for this work are available in state capital appropriations to the University and have been released by the Governor. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Dr. Walker, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Stone, Mr. Swain, Dr. Walker; no, none; absent, Mr. Jones, Governor Ogilvie, Mr. Page, Mr. Steger.

CONTRACT FOR CONSTRUCTION OF PARKING LOT. MEDICAL CENTER (27) The President of the University, with the concurrence of appropriate administrative officers, recommends the award of a contract in the amount of $27,800 to J. M. Corbett Co., Chicago, the low bidder, for construction of Parking Lot A-3 at the Medical Center campus. Funds are available from the Student-Faculty-Staff Parking operation.

On motion of Dr. Walker, this contract was awarded by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Stone, Mr. Swain, Dr. Walker; no, none; absent, Mr. Jones, Governor Ogilvie, Mr. Page, Mr. Steger.

CHANGES IN CONTRACT AND FINANCING FOR CONSTRUCTION OF MEDICAL RESEARCH LABORATORY A D D I T I O N , MEDICAL CENTER

(28) On September 18, 1968, the Board of Trustees requested the Illinois Building Authority to contract for the construction of the Medical Research Laboratory Addition at the Medical Center campus. During the course of construction, soil conditions were encountered which required additional work to the caissons. The additional direct construction costs were reported to and approved by the Board of Trustees (March 19, 1969, July 23, 1969, and October 15, 1969). The claims for additional compensation submitted