UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1972 [PAGE 269]

Caption: Board of Trustees Minutes - 1972
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 269 of 752] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1971]

U N I V E R S I T Y OF I L L I N O I S

259

The agreement recognizes the common purposes of the two institutions and will increase the educational opportunities for all students at both institutions as well as aid in ameliorating the articulation problems which arise when students go from a two-year community college to a four-year institution to complete work toward a baccalaureate degree. The institutions have agreed that either is free to withdraw at the end of any term from the program by notifying the other institution of its intentions.

This report was received for record.

COMPTROLLER'S MONTHLY REPORT OF CONTRACTS EXECUTED

(25) The Comptroller's monthly report of contracts executed was presented. Chicago Circle New Contracts

With Whom John Woodworth Leslie and John H. Leslie United States Air Force F33615-71-C-1175 Total Purpose Interpretation Center Building in the James Woodworth Prairie Preserve Material behavior in a wire under transverse impact Amount to be Paid to the University $ 95 000 15 000 *110 000

Medical Center Change Orders

Purpose Cost plus contract — heating, refrigeration and temperature control work: Reroute piping and revise ductwork. Hospital Addition

With Whom Mehring and Hanaon-Wendt, Total

Amount to be Paid by the University $ 10 027 $ 10 027

Urbana-Champaign New Contracts

Purpose Electronic properties of solid surfaces

With Whom United States Air Force AFOSR-71-2034 Total With Whom United States Office of Civil Defense DAHC20-70-C-0346 United States Navy N0OO14-67-A-03O5-0O17 Total With Whom Reliable Plumbing and Heating Total

Amount to be Paid to the University $ 49 453 * 49 453 Amount to be Paid to the University

$ 64 683

Change Orders

Purpose Conduct civil defense conferences, training courses, and emergency operations simulations Quenching of plasma recombination light by infrared and microwave radiation

29 000

$ 93 683

Purpose Cost plus contract — piping work: Steam Distrfbution System

Amount to be Paid by the University $ 22 000 $ 22 000 SI 10 000 143 136 S253 136 * 10 027 22 000 J 32 027

Summary

Amount to be paid to the University: Chicago Circle Urbana-Champaign Total Amount to be paid by the University: Medical Center Urbana-Champaign Total

This report was received for record.