1958] 13. 14. 15. 16. 17.

UNIVERSITY OF ILLINOIS 2 2 2 4 1 (31 525 000 500 900 380 879

63 ooo1 000 000 ooo 2 000 000) 000 000 000 000)

Biology Building, Second stage Physical Plant Service Building — Urbana-Champaign Electrical Engineering Addition Plant Sciences, Agronomy Smith Music Hall Addition

II. Utilities Distribution and Power Plant Urbana-Champaign Chicago Professional Colleges Chicago Undergraduate Division III. Land and Planning Land Acquisition Urbana-Champaign (Schedule C) Chicago Professional Colleges Chicago Undergraduate Division Plans and Specifications Urbana-Champaign (Schedule D) Chicago Professional Colleges Chicago Undergraduate Division IV. Protection of Life and Property, and Public and Street Life and Property Urbana-Champaign (Schedule E) Chicago Professional Colleges Public and Street Improvements Urbana-Champaign (Schedule F) V. Funds to Supplement Outside Grants (Schedule G) Urbana-Champaign Chicago Professional Colleges Grand Total Summary by Campus Urbana-Champaign Chicago Professional Colleges Chicago Undergraduate Division Grand Total Schedule A —1959-61 Biennium

REMODELING, REHABILITATION, AND M I N O R ADDITIONS —

7 100 200 5 500 (12 800

2 250 000 (515 ooo) 3 3 500 ooo 4 900 200 I 000 (7 850 Improvements 350 000 200 ooo 5 900 000 (1 450 000) 800 000 100 000

( 9 0 0 OOP)

000 000 000 000)

£54 879 000 S38 6 10 $54 155 724 000 879 000 000 000 000

URBANA-CHAMPAIGN

Appropriation — $i, 000,000 Improvements and rehabilitation of existing buildings are urgently needed. The following, not listed in any order of priority, are examples of such needs. 1. Remodeling of English Building for use by the Department of Physical Education for Women. 2. Remodeling of t h a t area vacated by Physics Department in Physics Laboratory for use by Mining and Metallurgical Engineering Department. 3. Remodeling of area vacated by Physiology Department in Natural History Building for use by Botany Department. 4. Remodeling of area vacated by Department of Bacteriology in Noyes Laboratory for use by Chemistry and Chemical Engineering Department. 5. Remodeling of area vacated by University Press in basement of Administration Building for expansion by other administrative units in building. Assumes the Department of Zoology will continue to use the Vivarium. Assumes completion of required space for Agronomy including greenhouses (based on new reduced standards). 3 To be provided through appropriations to the Medical Center Commission. * 5 Subject to adjustment after site has been selected by Board of Trustees. To correct a potentially dangerous overload condition in the electrical distribution system in the old hospital section.

1 2