UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1960 [PAGE 398]

Caption: Board of Trustees Minutes - 1960
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 398 of 1995] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1959]

With Whom United States Air Force

AF I8(6OJ)-62

U N I V E R S I T Y OF I L L I N O I S

Amount to be Paid (0 the

395

Effective Date January 19, 1959 N o v e m b e r 30, 1958 January 6, 1959 March 12, 1959 March 9, 1959 March 5, 1959 January 15, 1959 February 17, 1959 February 13, 1959

Purpose University High energy bunched electron beams $ 20 000 00 Gaseous electronics Evaluation of high temperature insulation for wires Dislocations and point defects Carcinogenicity of foods preserved by radiation Confidential Thermal injury of the skin Broad-band amplification in microwave frequency range Synthesis of liquids

112 992 00 16 946 07 42 719 00 16 998 00 4 : 251 00 16 609 0 0 2 007 00 IS 000 00

United States Air Force AF 19(6045-2152 United States Air Force AF 33<6l6)-3943 United States Army

DA-II-O22-0RD-2O9I

United States Army DA-49-«>7-MD-794 United States Navy Nobsr-6472j(i7i8) United States Navy Nonr-l459(02) United States Navy Nonr-r834(o8) Wyandotte Chemicals Corp., Air Force Subcontract, AF 33(6l6)-soS3 With Whom United S tates Army DA11-070-S08-ORD-593, University of Illinois, Prime Contractor, University of Iowa, Subcontractor United States Army DA36-039-SC 75055, University of Illinois, Prime Contractor, Kentucky Research Foundation, Subcontractor With Whom E. T. Drewitch (Plastering)

Purpose Proportioning materials to parts in a struct lira] aaspmhlv fnr maxistructural assembly for m n v L mum effective stiffness

Amount to be Paid by the University £10 060 00

Effective Date March 13, 1959

Measurement of intensity of surface precipitation by radar returns

3 105 00

March 3, 1959

Adjustments Made in 1958-59 Cost-Pius Contract

Forty items: 2440.00 Purpose J236.96 deduct to Amount $ 3 113 41 Date January, February, and March, 1959

This report was received for record.

A N N U A L REPORT OF T H E TREASURER

(19) In accordance with the By-Laws of the Board of Trustees, the Treasurer of the University has submitted a report of receipts and disbursements of University funds in his custody for the period March I, 1958, to February 28, 1959, certified by the Comptroller. A copy of this report was sent to each member of the Board of Trustees prior to today's meeting, and a copy is filed with the Secretary of the Board.

This report was received for record.

EMPLOYMENT OF ARCHITECTS AND ENGINEERS

Mr. Pogue reported that the Committee on Buildings and Grounds has considered the following recommendations from the President and other University officials for the employment of architects and engineers on University construction. Addition to Biology Building The firm of Richardson, Severns, Scheeler, and Associates, Champaign, on the building studies and design, and Shaw, Metz, and Dolio, Chicago, for the completion of plans and specifications. Mr. Ambrose Richardson has been employed for some time as consulting architect on campus planning for the University, and recently has been working in great detail on plans for the College of Liberal Arts and Sciences. This background will be helpful in the total planning on the addi-