Caption: Board of Trustees Minutes - 1940 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1940] UNIVERSITY OF ILLINOIS 9^5 willing to accept the contract on its original bid of $1,897. Since it is impossible to secure new bids and complete the installation within the time limit specified [or this project, the Director of the Physical Plant Department recommends the award of the contract to the Champaign Metal Weather Strip Company. A letter from Arthur H. Krebs & Company releasing the University from any responsibility will be obtained before the contract is executed. The Physical Plant Department was authorized to get new bids (with the authorization of the Federal Works Agency if possible). CONTRACT FOR L A N D S C A P I N G AT GREGORY H A L L A N D MCKINLEY HOSPITAL (53) In awarding the contract for the landscaping of the areas around Gregory Hall and the McKinley Hospital addition to Swain Nelson & Sons Company, the lowest bidder, the Board accepted two alternates—No. I, a deduction for evergreens to be supplied by the University; No. 2, omission of lawn operations —to bring the total of the contract within the amount budgeted for this work. The Director of the Physical Plant Department reports it is now known that sufficient funds will be available, and he recommends reinstatement in this contract of alternate No. 2 at $1,978 through Change Order No. 2. O n m o t i o n of M r . C l e a r y , t h i s r e i n s t a t e m e n t w a s a u t h o r i z e d . ASSIGNMENT OF FUNDS FROM POWER PLANT APPROPRIATION (54) T h e Director of the Physical Plant Department requests an assignment of $5,000 from the new Power Plant appropriation for the remodeling of the high-pressure steam line between the Auditorium and the old Power Plant. O n m o t i o n of M r . C l e a r y , t h i s a s s i g n m e n t of f u n d s w a s a p p r o v e d . SECRETARY'S The S e c r e t a r y p r e s e n t e d f o r executed by the President deposited with the Secretary Name Terre Haute Boiler Works Company A. S. Schulman Electric Company Edwin Pratt's Sons Co. William A. Pope Company REPORT OF CONTRACTS r e c o r d t h e f o l l o w i n g r e p o r t of c o n t r a c t s a n d t h e S e c r e t a r y of t h e B o a r d a n d since t h e last r e p o r t . A mount •?3° 746 22 884 12 268 128 500 Date March 14, 1940 March 14, 1940 March 14, 1940 March 14, 1940 Purpose Flues and ducts—New Power Plant Electrical installation work—New Power Plant Miscellaneous steel and iron—New Power Plant Piping system and erection of miscellaneous equipment—New Power Plant GRADUATE SCHOLARSHIPS AND FELLOWSHIPS T h e S e c r e t a r y p r e s e n t e d a l s o f o r r e c o r d t h e f o l l o w i n g list of g r a d u a t e s c h o l a r s a n d f e l l o w s a p p o i n t e d b y t h e P r e s i d e n t of t h e U n i v e r s i t y o n A p r i l 3, 1 9 4 0 . Accountancy Agronomy Bacteriology Botany Robert E. Koehler Willis A. Leonhardi Robert H. Weik Wayne E. Domingo Eileen J. Twiliger Lelah L. Galligar Glen R. Noggle Scholarship Scholarship Scholarship Fellowship Fellowship Scholarship Fellowship Scholarship Fellowship £300 300 500 500 500 300 500 Business Organization and Operation Grace G. Thompson Business Organization and Operation and Accountancy Chauncey M. Beagle
|