1940]

UNIVERSITY OF ILLINOIS

911

Change Order No. 2, contract with American Seating Company for Equipment, Group # E - 8 (Seating). Provide tablet arms in all lecture rooms on seats on left-hand side of aisles. Lecture Room # 1 0 0 . . . .28 Lecture Room # 2 1 3 27 Lecture Room # 2 2 3 10 Lecture Room # 3 1 9 i£ Total 75 @ $1.04—Add

$78 00

On motion of Dr. Meyer, the action of the President of the University in approving these change orders was confirmed, by the following vote: Aye, Mr. Cleary, Mr. Jensen, Mr. Karraker, Mr. Mayer, Dr. Meyer, Mr. Moschel, Mr. Pogue; no, none; absent, Mr. Adams, Mr. Horner, Mrs. Plumb, Mr. Wieland.

PAVEMENT OF SPRINGFIELD AVENUE (30) At its meeting on March 14 (Minutes, page 787), the Board (the Executive Committee) voted to accept the University's proper share of the cost of repaving Springfield Avenue, on condition that this extend from W r i g h t Street through to Lincoln Avenue and that the City's share of the gasoline tax be used in part payment of the cost. T h e City had originally proposed repaving only from W r i g h t Street to Goodwin Avenue. T h e city officials have advised that in their opinion it will be impossible to go ahead with the project under the conditions specified by the Executive Committee because 1. T h e City has already allocated its gasoline tax funds for other improvements; its officials consider it impossible to increase the allocation of funds from this source beyond the $2,400 originally contemplated. 2. Objections from property owners on Springfield Avenue east of Goodwin to Lincoln Avenue would block the improvement. These property owners claim that if Springfield Avenue is improved and widened it will become a thorofare, which they consider undesirable. In view of these circumstances, the Director of the Physical Plant Department recommends, and I concur, that the University assume its share of the cost of the paving of Springfield Avenue from W r i g h t Street to Goodwin Avenue, at an estimated cost of $17,205.

Action on this matter was deferred.

INSULATION FOR POWER AND HEATING PLANT BUILDING PIPING (31) T h e Director of the Physical Plant Department submits the following schedule of bids received on insulation for the piping in the Power and Heating Plant Building:

B I D SCHEDULE—POWER AND HEATING P L A N T P I P I N G INSULATION—DIVISION "D-D"

Bidder W . J . Donahoe Illinois Roofing & Insulation Company Johns Manville Sales Corp Standard Asbestos Mfg. Materials Co Asbestos, Asphalt and Ins. Mfg. Co Illinois Fire-Proof Covering Company Walker J a m a r Co Asbestos & Mag. Materials

Price of Insulation Installed Complete Ready for Service $37 890 30 188 29 812 33 328 31 875 33 279 36 880 29 812

H e recommends the award of the contract to the Asbestos and Magnesia