1939]

UNIVERSITY OF ILLINOIS

623

(2) Increase certain drain lines from 4" to 6" as requested in Physical Plant Department letter dated August 22, 1939. (3) Calk certain drain lines referred to in above letters with oakum in addition to cement. Total additional cost $ 95 91 Change Order No. 2, contract with Hatfield Electric Company for electrical work. (1) Furnish material for four Trumbull *'TT" switches $ 17 25 (2) Install 220-volt resistor and indicating lamp 9 00 ( I n accordance with quotations of September 5, 1939) Total addition Change Order No. 8, contract with Economy Plumbing & Heating Company for plumbing, heating, and ventilating work. This change order is to cover additional cost involved in providing gravel fill under drain and plumbing lines under the basement floor in accordance with letter dated April 21, 1939 Fifth Addition to Library Change O r d e r No. 7, contract with English Brothers for general work. Provide bronze card holders on the 100 cubicle doors in accordance with quotation of August 23, 1939—Add Change Order No. 5, contract with Carson-Payson Company for plumbing and heating. This order is to cover work necessary to install water service main so as not to interfere with new heat tunnel in accordance with drawing prepared by the Physical Plant Department and quotation of August 19, 1939—Add Change Order No. 2, contract with Anderson Electric Company for electrical work. Provide three additional light outlets in attic as directed; additional cost

26 25

20 00

137 00

42 50

17 06

O n m o t i o n of M r . M o s c h e l , t h e action of t h e P r e s i d e n t of t h e U n i v e r s i t y in a u t h o r i z i n g t h e s e c h a n g e o r d e r s w a s c o n f i r m e d . CONTRACT CHANGE ORDERS O N P.W.A. PROJECTS (7) On October 9 the Executive Committee authorized the following contract change orders: Gregory Hall Change Order No. 10, contract with the W . E. O'Neil Construction Company for general work. Restore to the contract Alternate Bid # 1 4 removed from the contract by a previous change order to permit installation of weather strips as specified—Add $1 200 00 McKinley Hospital Change Order No. 7, contract with W m . C. F. Kuhne for general work. Remodel areas adjacent to present kitchen as covered by request for estimate dated July 22, 1939, and estimate dated August 7, 1939—Add Funds are available in the construction fund for these changes.

1 276 54

On motion of Mr. Wieland, the action of the Executive Committee in authorizing these change orders was confirmed.