|
| |
Caption: Board of Trustees Minutes - 1940 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1939] UNIVERSITY OF ILLINOIS 615 Unit Price $54 10 6 85 78 12 34 40 36 20 None given None given 237 52 G R O U P IV—Marshall Field and Company: 1. W o r k Desk for Library, Item A 2. Lockers, Item B 3. Correspondence File, Item D 4. Card File, Item D 5. Steel Cabinet, Item E 6. Book Shelving, 30" wide, 9" deep, Item F 7. Newspaper Shelving, 30" wide, 18" deep, no back, Item F 8. Steel Storage Shelving, 36" wide, 12" deep, Item G G R O U P V—Garland B. Fletcher: 1. 500 w. Mogul base Mazda lamp 2. 300 w. Mogul base Mazda lamp 3. 200 w. Medium base Mazda lamp 4. 100 w. Medium base Mazda lamp 5. 100 w. Silver Bowl Medium lamp 6. 75 w. Medium base Mazda lamp 7. 60 w. Medium base Mazda lamp 8. 40 w. Medium base Mazda lamp 9. Attic spotlight, Item E G R O U P VII—Volland Scenic Studios: No Unit Prices. o o o o o o o o 25 888 407 222 ill 333 m in in 75 G R O U P VIII—American Seating Company: 1. Pedestal Tablet A r m Chair for Classrooms, installed 2. Tablet Arm Chair for Small Lecture Room, box spring seat, installed 3. Tablet Arm Chair for Large Lecture Room 4. Tablet A r m Chair for Auditorium G R O U P IX—Marshall Field and Company: 1. Reclining Chair, Item # 5 2. Single Panel Screen, Item # 7 3. Vanity Overbed Table, Item # 8 4. Bedside Stand, Item # 9 5. Straight Chair, Item # 1 1 6. Hospital Bed, Item # 1 3 7. Foot Stool, Item # 1 4 8. Hospital Bed, Item # 1 5 9. Hospital Bed, Item # 1 6 10. Dressers and Mirrors, Item # 1 9 4 5 7 7 32 92 11 45 20 17 30 9 5 20 2 21 21 30 16 92 24 52 15 16 80 84 28 80 No bids were received on items in Group I I I (bulletin boards, counters, cork and linoleum floors, and insect screens) which was probably due to the grouping of the items. T h e Physical Plant Department is preparing new specifications. T h e Director recommends rejection of bids received under Group V I as it was found the specifications practically restricted the bidding to one firm. T h e specifications are being rewritten and new bids will be secured on the equipment in this group. On motion of Mrs. Plumb, contracts were awarded to the lowest bidders, the unit prices were accepted, as recommended above, and the bids in Group VI were rejected.
| |