562

BOARD OF TRUSTEES

[September 30

Gregory Hall Change O r d e r No. I, contract with Robert Gordon, Inc. for heating, ventilating and air conditioning work. (1) Provide additional heating, ventilating and air conditioning to complete finishing of ground story in accordance with estimate dated May 27, 1939—Additional cost $9 108 00 (2) Revise heating system with alterations in rooms 105, 105A, 332A, and 332B as quoted on July 19, 1939—Addition 51 00 (3) Revise heating system in rooms 314, 316, 318, 320, and 322 in accordance with quotation of July 19, 1939—No change in price. Change Order No. 1, contract with Anderson Electric Company for electrical work. (1) Additional work necessary to complete east wing of ground story—Add I 329 78 (2) Additional work necessary to complete west wing of ground story—Add 555 50 (3) Minor changes in first story as covered by request for estimate, dated May 27, 1939—Add 23 40 (4) Additional electrical work resulting from subdividing of room #332—Add 48 26 (5) Provide two 2-conductor twisted and shielded microphone cables between the stage front panel and projection booth low tension box as quoted July 19, 1939—Add 19 50 (6) Provide two z/z" conduit stubs up from projection booth ceiling to above auditorium ceiling—Add 2 20 (7) Revise low tension cable lines across stage as quoted July 19, IQ39—No change in price. (8) Revise low tension runs from observation booth as quoted July 19. 1939—No change in price. (9) Provide telephone outlet in space #120A—Add 9 95 Change Order No. 6, contract with W. E. O'Neil Construction Company for general work. (1) Provision of additional work to complete work in ground story with estimate dated June 24, 1930.—Additional c o s t . . 13 299 00 (2) Omit weatherstripping as covered by alternate bid No. 14 forming part of original proposal—Deduct 1 200 00 (3) Increase size of spotlight opening in Auditorium ceiling— Add 3278 (4) Omit Wolmanizing treatment in ground story as quoted on June 22, 1939—Deduct 64 00 Change Order No. 2, contract with Robert Gordon, Inc. for heating, ventilating and air conditioning work. Provide 19 additional hand control valves on blast coil return connections in accordance with quotation dated July 25, 1939— Add 90 5° Change Order No. 3, contract with Robert Gordon, Inc., for heating, ventilating and air conditioning work. Omit tests of copper and steel piping in accordance with quotation of August 4, 1939—Deduct 27 50 lllini Union Building Change Order No. I, contract with W . E. O'Neil Construction Company for excavating and substructure work. (1) Cutting out four new beam pockets $101 21 (2) Installation of 6" drain line across basement 585 35 (3) Various incidental changes in reinforcing, concrete, etc., some being additions, some deductions, net 313 33