UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1940 [PAGE 564]

Caption: Board of Trustees Minutes - 1940
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 564 of 1164] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



19391

U N I V E R S I T Y OF I L L I N O I S

56l

Lots one (1) to seven (7), inclusive, in Block twenty-three (23); also sublots one (1) to seven (7), inclusive, of Lots nineteen (19) to twenty-five (25), inclusive, in Block twentythree (23); and the vacated alley running North and South through said Block twenty-three (23) ; in Ashland Second Addition to Chicago, in the West half of the Northeast quarter of Section eighteen (18), Township thirty-nine (39) North, Range fourteen (14), East of the Third Principal Meridian; and Lots fifteen (15), sixteen (16), seventeen (17) and eighteen (18), in Balestier's Subdivision of Block twenty-three (23) in Ashland Second Addition to Chicago, as shown upon the plat of said Subdivision, recorded in the Recorder's Office of Cook County, in Book 166 of Maps, pages 70 and 71, and also in Book 14 of Plats, page 85, all in the City of Chicago, County of Cook and State of Illinois;

Now, therefore, be it resolved, that the President and Secretary of the Board of Trustees of the University of Illinois be and they are hereby authorized and directed to execute a deed of warranty conveying the premises above described to the University of Illinois Foundation, a non-profit corporation of the State of Illinois. CONTRACT CHANGE ORDERS FOR PWA PROJECTS (7) In accordance with the authorization of the Board of Trustees, 1 have approved the following contract change orders and request confirmation of such approval: First Addition to McKinley Hospital Change Order No. 6, contract with the Economy Plumbing and Heating Company for plumbing, heating, and ventilating work. Provide 2" vent from mattress sterilizer in accordance with quotation dated July 20, 1939, additional cost Change Order No. 5, contract with W m . C. F . Kuhne for general work. (1) Provide eleven 14" x 1 8 ^ " metal access frames and doors to furred in areas under roof in third story—Add $ 93 50 (2) Provide cement plaster and base around front of incinerator front in basement per quotation of July 19, 1930—Add 44 30 $137 80 (3) Omit plastering for interior of dumbwaiter shaft —Deduct 44 33 Net Addition Change Order No. 1, contract with the Hatfield Electric Company for electrical work. (1) Lower 14 ceiling outlets three inches to accommodate acoustical ceiling $ 17 00 (2) Provide additional switch required incident to relocation of elevator D. C. generator 77 00 ("3) Relocate present X-ray transformer in transformer vault in line with new t r a n s f o r m e r s . . . . 56 00 Additional cost Addition to Library Change Order No. 6, contract with English Brothers for general work. Change details of arrangement for pneumatic tube terminal at delivery desk as well as details of remodeling of desk in accordance with revised drawing by Architect dated 4/25/39;— Additional cost Change Order No. 4, contract with T h e Carson-Payson Company for plumbing and heating work. Rearrange details of installation of pipe (heating) coils in ground story in accordance with estimate dated June 29, 1939 69 55 Revise six present radiators in accordance with quotation of June 30, 1939 (credit) 30 00 Net additional cost

$ 77 69

93 47

150 00

74 75

39 55