EXTRACTED TEXT FROM PAGE:



1938]

UNIVERSITY OF ILLINOIS

III

following vote: Aye, M r . A d a m s , M r . G e a r y , M r s . F r e e m a n , M r . K a r r a k e r , M r . Mayer, D r . Meyer, M r . Moschel, M r s . Plumb, M r . P o g u e ; no, n o n e ; absent, M r . Horner, M r . Wieland. M r . A d a m s , as Chairman of the Committee on Buildings and Grounds, was designated to be present for the Board at the opening of bids for the addition t o the Library.

ESTIMATES OF COST O F C O N S T R U C T I O N AND F U R N I S H I N G O F ILLINI U N I O N B U I L D I N G

(12) The Director of the Physical Plant Department has reported on the estimated cost of construction and furnishing of the Illini Union Building. The building cost estimates in Schedule A were prepared by Mr. Avery Brundage, Engineer and Contractor, of Chicago, who was retained for this service by the Physical Plant Department. The detailed estimates of the furnishings and equipment, exclusive of food service facilities, were prepared by Mr. Ambrose C. Kramer, of Chicago. All food service equipment, layouts, and estimates were prepared by Mr. F. E. Ricketts, of Chicago. O n motion of M r . K a r r a k e r , these estimates were received for record and filed in the hands of the Secretary.

CONTRACT FOR REROUTING OF SERVICE LINES

(13) A report of the following schedule of bids received by the Physical Plant Department on October 1, 1938, on the diversion of service lines and the construction of a new tunnel, to prepare the site of the Illini Union Building for its construction.

SCHEDULE OF BIDS, DIVERSION OF SERVICES, ILLINI UNION BUILDING Division i Division 2 Diversion of Steam Piping Alternate #i Deduct* Division 3 Division 4 Division 5

Contractors

Concrete Heating Tunnel

Diversion Diversion of Sanitary of Water Sewers Piping

Diversion of Electric Conduits

Base Bid General Work De Atley, E. N., Urbana.. . £11 275 English Bros., Champaign. . 11 98S General Paving Co., Cham-

$2 090

King & Petry, Champaign. . Somers, Frank A., Co., Plumbing Work Carson-Payson Co., Danville Mehring & Hanson Co., Mid-States Industrial Corp., Murray, Arthur W-, Co., O'Callaghan Bros., Chicago Electrical Work Allison, Edw. P., Co., Hatfield Electric Co., Kil-Bar Electric Co., Chicago Lamont.L. H.,& Co., Chicago Marrs-Tanner Electric Co., Sachs, S. C , Co., St. Louis..

$4- 250

12 298 2 203

$ 9 339

20 000 11 682 10 700

$t 415

2 722

4 242

6 753

3 729 2 000 3 188 2 800 3 485 4 389 3 900 5 490

8 736

12 475 8 300 9 498 9 900

•Alternate No. 1—For constructing main in tunnel instead of conduit.