UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1982 [PAGE 593]

Caption: Board of Trustees Minutes - 1982
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 593 of 658] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



582

BOARD OF TRUSTEES

[June 17

Contract for Renovation, Pier Room Cafeteria, Chicago Circle Center

(25) The Pier Room, located in the Chicago Circle Center, is used as a cafeteria, lounge, meeting, and game room. In order to improve its functional, aesthetic, and acoustical characteristics, a project has been developed which will include interior general construction work, electrical work, and new furnishings. On May 27, 1982, bids were received for the general construction work. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $79,900 to Fitzsimmons-Rill, Inc., Northbrook, the low base bidder, for Division I — General Work to renovate the Pier Room. The general work includes the construction of raised seating platforms, "open landscape" partitions, and acoustical panels. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve Account. (A schedule of the bids received has been filed with the secretary of the board for record.)

On motion of Mr. Bettenhausen, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mr. Neal, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Bettenhausen, Mr. Persons; no, none.)

Contracts for Equipment Replacement in the Laundry, Medical Center

(26) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for a project to replace ironing equipment in the Laundry at the Medical Center campus, the award in each case to the low base bidder: Division J — General Allied Mechanical Industries, Inc., Chicago Division HI— Heating, Piping and Temperature Allied Mechanical Industries, Inc., Chicago Division V — Electrical Markham Electric, Inc., Des Plaines Total Control 157 235 3 500 $167 320 $ 6 585

A schedule of the bids received has been filed with the secretary of the board for record. Nonappropriated funds in the Laundry operating budget are available to finance this project.

On motion of Mr. Bettenhausen, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mr. Neal, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Bettenhausen, Mr. Persons; no, none.)

Amendment and Extension of Lease of Space, 503-505 East Green Street, Champaign

(27) The president of the University, with the concurrence of the appropriate