44

BOARD OF TRUSTEES

[September 18

Capital Development Fund to the Capital Development Board for the University of Illinois for the projects shown below. Amount Project Budget Category Appropriated Medical Center campus Second Unit Dental — Medical Pharmacy Building Equipment 225 000 Urbana-Champaign campus English Building — Phase II Conversion of the Abbott Power Plant to Coal-Fired Boiler System Library Sixth Stack Addition Total Equipment Remodeling Planning 79 000 6 900 000 840 000 ($ 8 044 000)

$4,045,000 was appropriated from the Capital Development Fund to the Capital Development Board for Food Production and Research Facilities as shown

LKJUW.

Project Veterinary Medicine Basic Sciences Building Swine Research Center Agricultural Engineering Sciences Building Total

Budget

Category

Amount Appropriated $ 560 000 185 000

Equipment Equipment Building

3 300 000 ($ 4 045 000)

$1,845,800 was appropriated from the General Revenue Fund to the Capital Development Board for the University of Illinois for energy proj'ects as follows: Project Medical Center campus Remodeling of Mechanical Equipment in four campus buildings to provide control by the computerized energy management system Urbana-Champaign campus Rehabilitation of the ventilation ducts in two buildings Remodeling of the computer laboratory cooling system Remodeling of the steam absorption machines to install automatic controls Total Grand Total— University of Illinois Budget Category Amount Appropriated

Remodeling

$

534 400

Remodeling Remodeling Remodeling

32 100 128 400 1 150 900 ($ 1 845 800) $13 934 800 1

In addition to the new appropriations, the unexpended balances for all uncompleted proj'ects and unreleased proj'ects from prior years were reappropriated (SB 1664). All of these funds are subj'ect to release by the governor. I recommend that the comptroller be authorized to submit requests for release to the Capital Development Board and the governor for the capital projects approved by the governor.

1 SB 1665 also includes an additional $40,000 that has been appropriated to provide for studies that will consider the feasibility of utilizing Illinois coal at the Medical Center power plant.