UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1982 [PAGE 417]

Caption: Board of Trustees Minutes - 1982
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 417 of 658] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



406

BOARD OF TRUSTEES

[October 15

Increase in Contract for Pavilion, Chicago Circle

(17) On March 20, 1980, the Board of Trustees authorized the award of a contract to Berwyn Electric Co., Chicago, for electrical work for the Pavilion at the Chicago Circle campus. T h e contract did not include either the equipment for the theatrical lighting system or the electrical labor and material for installation of this lighting system. O n July 16, 1981, the Board of Trustees authorized the purchase of equipment for the theatrical lighting system. The electrical contractor will, for the additional sum of $24,900, provide labor and material, to bring power to various locations of the catwalk and to install the equipment. The cost of the theatrical lighting system (equipment and installation) is included in the project budget. Originally, separate bids were taken on the equipment and the installation. Bids were received for the equipment, but no bid was received for the labor and material required for the installation. Consequently, the recommendation is the result of a change order negotiated with the building construction electrical contractor. T h e cost of this work is within the amount budgeted for this portion of the project. T h e president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Berwyn Electric Co. be increased in the amount of $24,900 for the installation of the theatrical lighting system. Funds are available within the project budget from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N.

On motion of Dr. Donoghue, this recommendation was approved by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mr. Neal, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Bettenhausen, Mr. Persons; no, none.)

Contract for Installation of Smoke Detector System in the Student Residence Hall, Medical Center

(18) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contract for the installation of a smoke detector system in the Student Residence Hall at the Medical Center, the award being to the low bidder on its base bid plus acceptance of additive alternates nos. 1 and 2: Division V —Electrical work Add AU Add AU Contractor Gibson Electric Co., Inc., Westchester Base Bid $28 853 N6. 1 $1632 No. 2 $1946 Total $32 431

A schedule of the bids received has been filed with the secretary of the board for record. Funds are available from the Auxiliary Facilities System Repair and Replacement Reserve Account.

On motion of Dr. Donoghue, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mr. Neal, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Bettenhausen, Mr. Persons; no, none.)

Purchases

(19) T h e president submitted, with his concurrence, a list of purchases recommended by the directors of purchases and the executive vice president.