|
| |
Caption: Board of Trustees Minutes - 1982 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
332 BOARD OF TRUSTEES [July 16 This report was received for record. By consensus, the board agreed that one roll call vote would be taken and considered the vote on each agenda item nos. 25 through 33 inclusive. The recommendations were individually discussed but acted upon at one time. (The record of board action appears at the end of each item.) Contracts for Elevator Modifications at 400 South Peoria Street, Chicago Circle (25) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for modifications to the existing freight and passenger elevators in the building at 400 South Peoria Street, Chicago (formerly the Formfit Building), the award in each case being to the low bidder on its base bid plus acceptance of additive alternates No. 1 and No. 2. Division I — General Work Marcus Construction Co., Inc., Chicago Division VI— Conveying Systems Work United States Elevator Corporation, Melrose Park $ 7 500 106 453 Funds are available from the proceeds received "including investment earnings thereon" from the Thomas H. Rust Estate. (A schedule of the bids received has been filed with the secretary of the board for record.) On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Neal, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Bettenhausen, Mr. Persons; no, none.) Contracts for Remodeling in Administrative Computer Center, Roosevelt Road Building, Chicago Circle (26) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling for computer installation in Room 380 in the Administrative Computer Center in the Roosevelt Road Building at the Chicago Circle campus. T h e award is in each case to the low base bidder. Division III — Mechanical Work Comfort Systems, Division of West Town Refrigeration Corporation, Addison Division V — Electrical Work Monarch Electric Construction Co., Division of Bernard N. Lane Co., Chicago Total $48 235 28 980 $77 215 Funds are available in the operating budget of the University Office of Administrative Information Systems and Services.
| |