EXTRACTED TEXT FROM PAGE:



1981]

UNIVERSITY OF ILLINOIS

237

By consensus, the board agreed that one roll call vote would be taken and considered the vote on each agenda item nos. 17 through 23 inclusive. T h e recommendations were individually discussed but acted upon at one time. ( T h e record of board action appears a t the end of each item.) Contracts for Remodeling in the General Hospital, Medical Center (17) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of contracts for remodeling various rooms on the second floor of the General Hospital for the Department of Obstetrics and Gynecology. T h e project consists of remodeling to consolidate the administrative unit of the department from various campus locations to the second floor of the General Hospital. T h e space was previously utilized as a patient ward and patient rooms, which were vacated when the new hospital was completed. The award in each case is on the low base bid plus acceptance of the indicated additive alternate bids: General Work Wm. J. Scown Building Co., Base bid plus additive Chicago alternates # 1 , 2, and 3 $46 887 Plumbing Work Admiral Heating & Ventilating Co., Hillside Ventilation Work Admiral Heating & Ventilating Co., Hillside Electrical Work Mid-America Electric Co., Inc., Palatine Total Base bid plus additive alternate # 1 Base bid

8 725 7 385

Base bid plus additive alternate # 1

13 074 $76 071

The total project cost of $89,200 will be funded as follows: $68,700 from the state funds operating budget of the Physical Plant and $20,500 from the restricted funds operating budget of the Abraham Lincoln School of Medicine. A schedule of bids received has been filed with the secretary of the board for record. O n motion of Dr. Donoghue, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. H a h n , Mr. M a d d e n , Mr. Neal, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Howard, Governor Thompson. ( T h e student advisory vote was: Aye, M r . Maltese, Mr. Peterson; no, none; absent, Mr. Silverman.) Contract for General Restoration Work to Memorial Stadium, Urbana (18) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract in the amount of $170,919 to Edward W. Iossi, Inc., Davenport, Iowa, the low bidder on its base bid plus acceptance of additive alternates 1, 2, and 4, for general restoration work to Memorial Stadium. The base bid is for restoring the concrete deck above occupied areas of the stadium in the southeast, southwest, and northwest concourses and horseshoe walkway, major plaster on the exterior and minor plaster on the interior toilet