UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1982 [PAGE 192]

Caption: Board of Trustees Minutes - 1982
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 192 of 658] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1981]

UNIVERSITY OF ILLINOIS

181

Contracts for Remodeling for Installation of X-ray Equipment in Hospital Addition, Medical Center

(17) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for remodeling for the installation of x-ray equipment in Rooms 346 and 358 in the hospital addition at the Medical Center campus, the award for general work being to the low base bidder plus acceptance of additive alternate no. 1 and for electrical work to the low base bidder. General Work Marcus Construction Co., Chicago Electrical Work Mid America Electric Co., Inc., Palatine Total $25 530 21 980 $47 510

Construction will begin in March 1981 and is scheduled for completion by May. Funds for this project are available from the Hospital Income Fund. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mr. Neal, Mr. Stone; no, none; absent, Mrs. Shepherd, Governor Thompson. (The student advisory vote was: Aye, Mr. Maltese, Mr. Peterson, Mr. Silverman; no, none.)

Contracts for Patio Enclosures, Intramural-Physical Education Building, Urbana

(18) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for roof enclosures and partitioning and finishing to convert two interior patios at the IntramuralPhysical Education Building at the Urbana-Champaign campus into administrative and classroom space. The award in each case is to the lowest bidder on its base bid, plus acceptance of the indicated additive alternates. Division I — General Work English Bros. Co., Champaign Division II — Plumbing Work Dever Heating & Air Conditioning Co., Inc., Urbana Base Bid plus Additive Alternates G-l, G-2, G-3, G-4, and G-5 $118 930 Base Bid 2 200

Division III — Heating and Air Conditioning Work Dever Heating & Air Conditioning Base Bid Co., Inc., Urbana Division IV — Ventilation Work Dever Heating & Air Conditioning Co., Inc., Urbana Division V •— Electrical Work Witte Electric Co., Champaign Total Base Bid

21 200

15 300

Base Bid plus Additive Alternates E-2 and E-6

22 095 $179 725