UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 660]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 660 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Peoria Street building (University Center), energy conservation project, install modular chillers, night temperature setback and modular high efficiency boilers, 80 See also Formfit building Peoria-Tazewell Pathology Group, S.C.. contracts. 266, 601 Pepper Construction Company, litigation, claims against the University for alleged additional costs in construction of Pavilion (University Center), employment of special counsel, authorization, 2 settlement. 151 Pepoerberg, D. R., appointment, 448 Periodontics, Department of (Health Sciences Center), head, appointment, 534 Perkins, J. O., member of advisory council, 337 Perlow, M. J., appointment, 228 Perry, K. R., defendant, complaint filed by Raymond Barbosa, 34 Peter, A. P., member of advisory committee, 9 Peter, F. M., member of advisory committee, 10 Petersen, G., member of advisory board, 200 Petersen, I. J., member of advisory board, 200 member of advisory council. 73 Peterson, H., member of advisory committee, 9 Petty, C. A., and Sons, Inc., contracts, 466, 521 Pfefter, W. J., member of advisory committee, 124 Pflaum, S. W., appointment, 14, 292 Pharmaceutics, Department of (Health Sciences Center), head, appointment, 417 Pharmacodynamics, Department of (Health Sciences Center), remodeling of space, 518 Pharmacy, College of (Health Sciences Center >. advisory committee, appointments, 49. 33G contracts, remodeling, electrical work, 431 general work, 431 ventilation work, 431 remodeling laboratory, electrical work, 518 general work, 518 plumbing work, 518 ventilation work, 518 degrees, Bachelor of Pharmacy, discontinued, 297 conferred, 279, 280, 614, 615 Doctor of Pharmacy, replaces Bachelor of Pharmacv, 297 revised, 297 nonsalaried clinical faculty. 53, 347 Pharmacy. College of, building (Health Sciences Center), contracts, hood and ventilation systems, renewals and modifications, electrical work. 162 mechanical work. 162 ventilation work, 162 roof resurfacing. 602 energy conservation project, 437 contract, engineering services, 464 Pharmacy Administration, Department of (Health Sciences Center), head, appointment. 340 Pharmacy fee, University Center, no increases, 210, 542 Pharmacy Practice, Department of (Health Sciences Center), departmental reorganization, change from chairpersonship to headship, 77 Phillip, W., member of Center for Advanced Study, 450 Phillip-Arensman, G., member of advisory committee, 10 Phillips, G. N., Jr., appointment, 13 Phillips. Swager and Associates, contract, 241 Physical education (University Center), degrees. Bachelor of Science, option I and option II of the physical education curriculum, revised, 487 supplemental program in kinesiotherapy (corrective therapy), revised, 487

651

Physical Education, Department of (University Center), minor, sports studies, established, 16 Physical Education building (University Center), energy conservation project, 437 contract, engineering services, 464 Physical facility services, contracts, Medicine, College of (Chicago), 25 renewal, 375 Medicine, College of (Peoria), 26 renewal, 375 Medicine, College of (Rockford), 26 renewal, 375 Metropolitan Chicago Group of Affiliated Hospitals, 25 Physical Plant department (Chicago campuses), contracts, consulting services, data processing system (IMIS), revisions, 402 Physical Plant Services building (Urbana), energy conservation project, 438 contract, engineering services, 464 Physiology and Biophysics, Department of (Urbana), head, appointment, 483 remodeling of space, 496 Piedmont Aviation, Inc., Airport, University of Illinois—Willard, services agreement, 211 Pigott, R., member of advisory council, 337 Piping work, contracts, Health Sciences Center, Dentistry, College of, building, 548 Hospital, General, remodeling space for Department of Surgery. 602 Student Residence Hall, chilled-water system, 519 University Center, Stevenson Hall, remodeling, 461 Urbana, Adams, Roger, Laboratory, remodeling, 494 Hydrosystems Laboratory, remodeling, 493 Newmark Civil Engineering Laboratory, remodeling, 493 cost-plus contracts, minor building alterations, repairs, and new construction, Health Sciences Center, 239, 570 University Center, 239, 570 repairs, minor remodeling, and new construction, Urbana, 214 extension, 571 Pitcher, E. S., appointment. 485 Pttroda, S. G., member of advisory board, 8 Pittway Corporation^ Charitable Foundation, contracts for social work awarded to College of Medicine at Peoria, 78, 312 Pizer, I. H., appointment, 449 University librarian at Health Sciences Center. 391 Plabm, D., invention, patent rights, release to inventor. 182 Planned Lighting, Inc., and Imperial Lighting Maintenance Company, contracts, 268, 604 Planned Parenthood Association, contract, 267 Planning and resources management (Chicago campus), associate chancellor, appointment, 563 duties, 563 Planning and Resources Management, Office of (Chicago campus), head, appointment, 563 Plant Biology. Department of (Urbana), name, changed from Department of Botany. 230 Plant Pathology, Department of (Urbana), advisory committee, appointments, 9. 291 Plastering work, cost-plus contract, Urbana, repairs, minor remodeling, and new construction. 214 extension, 571 PLATO system, contracts with Control Data Corporation (CDC), renewal, 318 report for information, 455 copyright provisions applicable to lessonware or software, revision, 304 courseware agreement with Control Data Corporation, amendment, 55