UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 656]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 656 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Medicine, College of (Peoria), cont'd physical facuity services, 26 renewal, 375 degrees, conferred, 614, 615 director, appointment, 446 nonsalaried clinical faculty, 54, 346 receipt of contract for social work. 78, 312, 430 subcontracts for social work, 78, 430 renewal, 312 tuition increases for professional program, . 205, 539 Medicine College of (Rockford), community health centers, acquisition by University, 164 contracts, educational services, 267, 601 physical facility services, 26 renewal, 375 degrees, conferred, 279, 280, 615 director, appointment, 416 energy conservation project, modify chilled water and HVAC systems, 80 nonsalaried clinical faculty, 54, 347 provider of prepaid medical services, 397 staff opposition, 397 ' tuition increases for professional program, 205, 539 Medicine, College of (Urbana), contracts, educational services, 266, 600 degrees, conferred, 280, 614, 615 director, appointment, 446 lease of space, 316 nonsalaried clinical faculty, 54, 347 tuition increases for professional program, 205, 539 Medicine, College of, East Tower (Health Sciences Center), contracts, computer cable network, installation, 549 elevator modifications, 315 laboratory remodeling, electrical work, 490 general work, 490 mechanical work, 490 plumbing work, 490 ventilation work, 490 outpatient clinic, improvements, 379 window replacement, 603 Medicine, College of, West Tower (Health Sciences Center), contracts, outpatient clinic, improvements, 379 repair fume hoods, 432 window replacement, 603 energy conservation project, 437 contract, engineering services, 464 Melhado, L. L., invention, patent rights, release to sponsor, 428 Meller, E., invention, patent rights, release to sponsor, 454 Memorial Stadium (Urbana), contracts, concrete ramp for wheelchairs, 270 renovation, consulting services, 401 electrical work, 400 genera] work, 400 plumbing work 400 ventilation work, 400 structural design upgrade and rehabilitation, consulting services, 102, 164 amendment, 144 structural modifications and rehabilitation^ consulting services, 215 electrical work, 215 general work, 215 plumbing work. 215 ventilation work. 215 football practice field, improvement and enlargement, appropriation, 190 project approved, 190 renovation, project approved, 400 structural modifications and rehabilitation, project approval, 215

647

Mental disorder, involuntary withdrawal of students for psychiatric reasons, policy and procedures, 395 Mercy Hospital (Chicago), contract, 266 Mercy Hospital (Urbana}, contracts, 267, 601 Mercy Hospital and Medical Center, contracts, 25, 600 renewal, 376 Merrill, R. E., member of advisory board { 124 Merriman, N., member of advisory committee, 291 Merritt, A. L., appointment, 535 Merritt, D. J., appointment, 535 Merwin, W. S*, Archives, acquisition, 522 Messenger, C. K., member of Institute for the Humanities, 566 Metallurgical engineering (University Center), Bachelor of Science degree, established, 515 Metallurgy (University Center), area of concentration, degree, name changed to Bachelor of Science in Metallurgical Engineering, 515 Methodist Medical Center of Illinois, contracts, 26, 266 601 renewal, 376 Metropolitan Chicago Group of Affiliated Hospitals, contracts, physical facility services, Meyer, J. M., member of advisory committee, 291 Meyer, R. T., litigation regarding employment status, report, 248 settlement, 324 settlement agreement, 390 resignation as basketball coach (Chicago), 324 Meyer, S. R., appointment, 159 Meyer Roofing, Inc., contract, 521 Meyers, E., member of advisory committee, 291 Miale, T. D., appointment, 51 Micklich, B. J., appointment, 448 Microbiology, Department of (Urbana), head, appointment, 340 teaching requirement for doctoral degree candidates, established, 422 Microbiology and Immunology, Department of (Health Sciences Center), development of wet laboratory, 549 Microelectronics, held of, support by Semiconductor Research Corporation, 244 Microelectronics Center (Urbana), creation, 89 use of Water Resources building, State legislation appropriating monies for conversion, 289 Microfilming Corporation of America (MCA), agreement, 309 Mid America Electric Co., Inc., contracts, 212, 378, 5491 Midstate Aviation Center, Inc., Airport, University of Illinois—Willard, fixed base operation services, agreement, amendment, 596 Midwest Interstate Electrical Construction Co., contract, 550 Midwest Lightning Rods, cost-plus contract, 214 extension, 571 Midwest Radiation, contract, 601 Miescke, K. J., appointment^ 52 Mika, E. S., undergraduate instructional award, 567 Military Selective Service Act, amendment, signed into law bij President Reagan, 195 Milkint, C. R., appreciation certificate, 582 installation, 286 introduction, 286 Millar, J. R., appointment, 589 Miller, C. R., appointment, 344 Miller, G. A., appointment, 74 Miller, I., comventor and principal investigator,