Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 443]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 443 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



434

BOARD OF TRUSTEES

[November 17

Construction Contracts (and Budget Revision), Auditorium Addition, Urbana

(29) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends, subject to the transfer of funds from the University of Illinois Foundation to the University, the award of the following contracts for the renovation of and addition to the Auditorium at the Urbana-Champaign campus; the award in each case being to the low bidder on its base bid plus acceptance of the indicated alternate bids. 1

fii/Je

Division I — General Ellington Miller Edmonds, Inc., Danville. .Base Bid $2 214 000 Alternate 1 . . 35 700 Alternate 16 . 188 700 $2 438 400 Division II — Plumbing G. A. Rich & Sons, Inc., Deer Creek Base Bid Alternate 16 . 120 573 3 200

123 773

Division III — Fire Protection Safeguard Fire Protection, Division of Harshman Plumbing, Heating, and Electrical Company, Sullivan

Base Bid . . . . Alternate 10 .

42 338 1 878

44 216

Division IV — Heating, Ventilation, and Air Conditioning R. H. Bishop Company, Champaign Base Bid . . . . Alternate 9 . . Division V — Electrical Potter Electric Service, Inc., Urbana

479 800 (5 322)

474 478

Base Bid Alternate Alternate Alternate Alternate Alternate Alternate

.... 1 .. 9 .. 13 . 14 . 15 . 16 .

478 2 (2 47 10 11 4

000 426 000) 650 342 000 900

552 318

Division VI — Seating T h e Larson Company, Chicago Total

Base Bid . . . . $

144 985

144 985 $3 778 170

It is further recommended that: (1) all contracts, other than the contract for general work, be assigned to the contractor for general work; and (2) an agreement

1

Explanation or alternate bids: Alternate 1 — provide a stage platform lift, 8 by 10 feet. Alternate 9 — delete secondary chilled water pumps for conditioned air. Alternate 10—provide new sprinkler heads to replace existing heads in the ceiling plenum under the balcony and in the basement for safety purposes. Alternate 13 — provide a new lighting chandelier in the main auditorium in lieu or relamping the existing chandelier. Alternate 14 — provide decorative lights below the balcony rail. Alternate 15 — provide exterior decorative lighting on every third rib of the roof dome. Alternate 16 — provide a new forecourf. including grading, new concrete walks, steps and pavement, limestone balustrades, drainage work, and wiring for exterior electrical power and light.