EXTRACTED TEXT FROM PAGE:



1983]

UNIVERSITY OF ILLINOIS

399

Add. Alt. 4' Add. Alt. 5* Total

Base - . . . . „ , Bid Division I — General Poulos Bros. Construction Co., Inc., Chicago $232 527 Division II — Plumbing A & H Plumbing and Heating Co., Inc., Chicago . . . 38 470 Division IV — Ventilation Allied Mechanical Industries, Inc., Chicago 43 911 Division V — Electrical Berwyn Electric Company, Chicago . . . Total

Add. Alt. 1'

Add. Alt. 3'

$2 100

$3 780

$1 050

NA

$239 457

NA

NA

NA

$1 630

40 100

NA

NA

2 550

NA

46 461

87 200

NA

NA

1 200

250

88 650 $414 668

It is further recommended that: (1) all contracts, other than the contract for general work, be assigned to the contractor for general work; and (2) an agreement be entered into with Poulos Bros. Construction Co., Inc., Chicago for the assignment of the other prime contracts. The revised project budget will permit an increase in size of the project to 4,300 gross square feet; provide additional equipment, interior furnishings, and mechanical/electrical requirements for the kitchen facility; and provide an increased amount for site development. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N, and the restricted funds operating budget of the Chicago Mini Union. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . H o w a r d , these contracts were a w a r d e d by the foll o w i n g v o t e : Aye, M r s . D a y , D r . D o n o g h u e , M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . L o g a n , M r . M a d d e n , Mrs. Shepherd, M r . S t o n e ; n o , n o n e ; absent, G o v e r n o r T h o m p s o n . ( T h e student advisory v o t e w a s : A y e , M r . Bolen, M r . M i l k i n t ; n o , none.)

Contracts for Completion of Neurovascular and Cardiovascular Rooms, University of Illinois Hospital, Chicago

(11) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for completion of rooms for neurovascular and cardiovascular procedures in the University of Illinois Hospital, the award in each case to the low bidder on its base bid.

1 Alternate of ceiling. 1 Alternate 1 Alternate 4 Alternate nections.

# 1 provides ceramic tiles to walls of both restrooms from floor base to underside # 3 provides brick screen wall and slab for trash compactor. # 4 provides air-curtain at the south vestibule to the kitchen. # 5 provides a domestic hot water recirculating system and all electrical con-