1984]

Rockford Rockford Memorial Hospital St. Anthony Hospital Swedish American Hospital Total Grand Total

UNIVERSITY OF ILLINOIS

75

Estimated Annual Cost1 $ 62 210 30 540 64 780 $ 157 530 $1 016 390

It is further recommended that the chancellor, with the concurrence of the appropriate administrative officers, be granted authority to approve changes in the amounts to any of the institutions within the $1,016,390 allocation. Funds are available from the FY 1985 State Appropriated Funds operating budget in the Office of the Vice Chancellor for Health Affairs. T h e vice president for business and finance supports the recommendation. I recommend approval.

On motion of Mrs. Day, these recommendations were approved by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Amendment to Contract for Magnetic-Resonance Imaging System, Chicago

(31) On October 20, 1983, the trustees approved a contract with the General Electric Company for a magnetic-resonance imaging system at the Health Sciences Center. T h e contract included equipment purchases of $1,750,000 and installation costs not to exceed $1,500,000. T h e initial plan anticipated the award of future contracts for replacement of the roof and some windows in the Aeromed L a b Building before the equipment could be installed. Based on an environmental study by its Medical Facilities and Construction Services Division, General Electric has advised that the equipment can be installed in the prepared space only by lowering it through hatches in the roof; these need to be prepared specifically for this purpose. Therefore, the chancellor at the Chicago campus has recommended an increase of $250,000 in the contract to allow for installation of the equipment through the roof and associated roof repairs and window replacements. Funds for the additional cost are available in the Hospital Income Fund. The vice president for academic affairs and the vice president for business and finance concur in the recommendation. I recommend approval.

On motion of Mrs. Day, this recommendation was approved by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contract for Switchgear Renovation, Student Residence Hall, Chicago

(32) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract to Chatfield Electric, Inc.,

1

Based on a rate of $3.94 per gross square foot per year.