UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1986 [PAGE 669]

Caption: Board of Trustees Minutes - 1986
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 669 of 688] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



658

BOARD OF TRUSTEES Memorial Stadium, cont'd drainage work, 214 earthwork, 214 engineering services, 214 paving work, 214 electrical line extension, 429 football facilities addition, architectural services, 101 amendment, 215 engineering services, 101 amendment, 215 football facilities renovation and addition, air conditioning work, 358 architectural services, 358 electrical work, 358 general work, 358 increase, 550 heating work, 358 plumbing work, 358 ventilation work, 358 foundation wall, general work, 248 foundation walls for air-supported structure, electrical work, 248 general work, 248 installation of air-supported structure, electrical work, 352 general work, 352 plumbing work, 352 northwest ramp tower locker room renovation, electrical work, 247 general work, 247 heating work, 247 plumbing work, 247 temperature control work, 247 ventilation work, 247 steam line extension 429 Zuppke Field, additional lighting, award of, 613 comptroller's authority to award, 576 football facilities, noninstructional facility designation, renovation and addition, request to Illinois State Board of Higher Education, 243 football facilities addition, appropriation, 101 project approved, 101 project increased, 215 football facilities renovation and addition, appropriation. 214 northwest tower locker room remodeling, appropriation, 214 Mendoza, G. A., appointment, 144 Meneley Construction Company, contract, 99, 542 Mengler, T. M., appointment, 336 Mercy Hospital (Urbana), contract, 306, 603 Mercy Hospital and Medical Center, contract, 306, 347, 603 renewal, 74 Merrill Lynch, Pierce, Fenner & Smith, Inc., contract, 17 Merszei, L. G., member of advisory council, 58 Metallurgy and Mining Engineering, Department of (Urbana), head, appointment, 374 Methodist Medical Center of Illinois, contract, 306, 348, 603 renewal, 74 Michael, G. R., appointment, 404 Michaels, E. K., appointment, 453 Michalski, R. S., assignment of ownership and copyright in computer software programs, 424 Microbiology, Department of (Urbana), head, appointment, 61 Microbiology ana Immunology, Department^ of (Health Sciences Center), head, appointment, 481 Microelectronics Center (Urbana), contract, architectural services, 249 engineering services, 249 utility master planning consultant, 464 Mid America Electric Co., Inc., withdrawal of bid, 77

Medical-Surgical Nursing, Department of (Health Sciences Center), head, appointment, 559 Medicare, coverage for new employees, 521 Medicine, College of ^( Chicago), Clarence C. Saelhof Professorship, established, 267 contracts, educational services, 306, 603 physical facility services, 347 renewal, 74 degrees, conferred 321, 322, 620, 621 nonsalaried clinical faculty, 67? 379 tuition Increases for professional program, 236, 529 tuition rates, letters expressing students' concerns, 499 Medicine, College of (Health Sciences Center), See Medicine, College of (Chicago) Medicine, College of (Peoria), contracts, educational services, 306, 603 physical facility services, 348 degrees, conferred, 321, 322, 621 nonsalaried clinical faculty, 68, 380 presentations from director and staff to the Board of Trustees' Committee of the Whole, 41 tuition increases for professional program, 236, 529 Medicine, College of (Rockford), contracts, educational services, 307, 604 physical facility services, 74, 348 degrees, conferred, 322, 620 nonsalaried clinical faculty, 68, 380 presentation to the board concerning operations and activities, 414 tuition increases for professional program, 236, 529 Medicine, College of (Urbana), contracts, educational services, 306, 603 degrees, conferred, 322 nonsalaried clinical faculty, 68, 380 reorganization of clinical faculty into departments. 71 tuition increases for professional program, 236 Medicine, College of, East Tower (Health Sciences Center), contract, remodeling for Center for Genetics, electrical work, 77 general work, 77 laboratory furniture, 78 piping work, 77 plumbing work, 77 ventilation work, 77 energy conservation project, 317 remodeling for Center for Genetics, withdrawal of bid, 77 Medicine, College of, West Tower (Health Sciences Center), energy conservation projects. 105 contract, engineering services, 155 Medicine, Department of (Peoria), departmental reorganization, change from headship to chairpersons hip, 458 head, appointment, 418 Medicine and Medical Specialties, Department of (Rockford), chairperson, appointment, 143 Mediflex Systems Corporation, 272 Meier, P. P., appointment, 403 Meinert, J. R., member of advisory council, 400 Mclberg, G. M., appointment, 66 Meller, J. D., member of advisory committee, 142 Memorial Stadium, air-supported structure, appropriation, 214 noninstructional facility designation, request to Illinois State Board of Higher Education, 243 artificial playing surface replacement, appropriation, 214 contract, artificial playing surface replacement, artificial surface work, 214 demolition work, 214