UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1986 [PAGE 654]

Caption: Board of Trustees Minutes - 1986
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 654 of 688] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Electrical work, cont'd remodeling, 30. 123 remodeling Tor Department of ChemisStudent Residence Hall, 350 student residential facilities, 467 Urbana, Allen Residence Hall, life-safety improvements, 246 Assembly Hall, replace theatrical lighting, 310 Astronomy Building, remodeling for supercomputer installation, 275 Baseball Stadium, 543 Burrill Hall Annex, first floor enclosure, 386 Ceramic Engineering Kiln House, remodeling, 212 Dairy Manufactures Building, 353 Davenport Hall, remodeling, 32 Digital Computer Laboratory, air conditioning system improvements, 152 Fire Service Institute, improvement projects for Fiscal Year 1985, 153 Florida Avenue Residence Halls, dining rooms remodeling, 274 Fourth Street Residence Halls, life-safety and general renovations, 247 Illinois Street Residence Halls, remodeling, 542 Lincoln Avenue Residence Hall, life-safety improvements, 246 McKinley Health Center, 607 Memorial Stadium, football facilities renovation and addition, 358 Newmark Civil Engineering Laboratory, interior remodeling, 100 Nuclear Physics Laboratory, cooling facilities for nuclear accelerator, 430 Plant Pathology Shop and Storage Building, interior development, 79 Taft/Van Doren Residence Halls, lifesafety and general renovations, 247 Talbot Laboratory, 463 Water Resources Building, 577 cost-plus contract, minor building alterations, repairs, and new construction, Health Sciences Center, 574 renewed, 308 University Center, 574 renewed, 308 Urbana, 213,_245 renewed, 575 Electronic Decisions Incorporated (EDI), 36 sublease of space from University Microelectronics Cenier (UMC), 36 1140 South Paulina (Chicago), renamed Personnel Services Building, 424 Elkin, S. L., honorary degree, 455 Ellington Miller Edmonds, Inc., contract, 153 Elston, A., member of advisory council, 58 Emergency power distribution network {Chicago campus), contract, engineering services, 431 Endowment farms, hedging commodity production, account transferred to Stotler and Company, 181 Endreny, P. M,, appointment, 195 Energy conservation projects, contracts, engineering services, 155, 488, 489 Health Sciences Center, 104, 317 University Center, 104 Urbana, 104 Energy conservation projects grants, 104, 317 Energy Management & Engineering, Inc., contract, 155 Enfield Experimental Field (White County), easement, water main, 408 Engelbrecht, W-, member of advisory council, 59 Engineering (University Center), degree, Bachelor of Science, revision, 456

643

Engineering, College of (University Center) f advisory board, appointments, 6, 57, 333 consolidation of two departments. 529 degree, Bachelor of Science in Engineering, major in manufacturing engineering, discontinued, 71 Master of Science in Industrial and Systems Engineering, minimum grade requirement established, 176 degrees, conferred, 318, 319, 320, 617, 618, 619 # fund-raising activities, 521 Engineering, College of (Urbana), dean, appointment, 230 degrees, conferred, 87, 106, 161, 323, 393, 441, 472, 622 establishment of Department of Nuclear Engineering, 504 food engineering specialization, established, 527 fund-raising activities, 521 minor in polymer science and engineering, established, 236 research agreement, exception to patent policies, 202 Engineering Experiment Station (Urbana), director, appointment, 9, 595 Engineering Research Facility (University Center), contract, architectural services, 578 engineering services, 578 Engineering Research Laboratory {University Center;, contract, architectural services, 431 Engineering services, contract, Chicago campus, emergency power distribution network, 431 parking lot at corner of Taylor and Wood Streets, 311 Construction Engineering Research Laboratory, addition to laboratory facility, 351 Health Sciences Center, Medicine, College of, West Tower, 155 Pharmacy Building, 155, 488 upgrade of ventilating and air conditioning sysLems, 126 Pharmacy Practice Simulation Laboratory, 431 Stafi Apartments Building, remodeling of office space, 487 Steam Plajit, 155, 489 boiler installation, 216 Steam Plant addition, 216 University Center, chemistry laser laboratory, 431 Hunt Building, remodeling and upgrading. 249 Ice Rink, 311 Library Building, renovation, 126 student residential facilities, 100, 275, 467. 512 Utilities Building, 155 Urbana, Abbott Power Plant, 155 Adams, Roger, Laboratory, 155 Animal Sciences Laboratory, addition and remodeling, 544 modification of utility systems and extension of chilled water lines, 127 Athletic Center, site development, 354 baseball stadium., 354 Beckmaji Institute for Advanced Science and Technology, 463 amandment, 512, 545, 609 Bevjer Hall, roofing work, 127 Busey-Evans Residence Hall, 355 increase, 468 Civil Engineering Building, roofing work, 127 Dairy Manufactures Building, 353 Digital Computer Laboratory Addition, 578 Electrical Engineering Building remodelmg, 431