Contract for Remodeling, Fred H. Turner Student Services Building, Urbana

(23) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $70,159 to Johnson-Stirewalt Construction Co., Urbana, to remodel the Financial Aid Office on the fourth floor of the Fred H. Turner Student Services Building, Urbana. The remodeling will provide additional offices in an existing, open, general office area, a new reception area with counter, a file room, and a job-posting area. This project consists of partial interior remodeling of approximately 6,300 square feet and includes minor demolition, new partitioning, reworking of existing lighting, and new finishes. Funds are available in the Fiscal Year 1987 restricted funds operating budget of the Urbana campus. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r s . D a y , this contract w a s a w a r d e d by the following v o t e : A y e , M r s . D a y , M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , M r . L o g a n , M r . M a d d e n , Miss S m i t h ; n o , n o n e ; absent, M r . H o w a r d , Mrs. S h e p h e r d , Governor T h o m p s o n . ( T h e student advisory v o t e w a s : A y e , M r . Becker, M r . L a m m ; n o , none.)

Contracts, Baseball Stadium and Related Site Work, Urbana

(24) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the construction of the Baseball Stadium at the Urbana campus. The award in each case is to the low bidder on its base bid, plus acceptance of the indicated alternate. Division I — General Williams Brothers Construction, Inc., Peoria

Base Bid . . $1 078 000 Alt. G-l . . 6 996 $1 084 996

Division II— Plumbing Mechanical Piping, Inc., Downs Division III — Heating, Piping, Refrigeration, and Temperature Control A & R Mechanical Contractors, Inc., Urbana Division IV — Ventilation and Air Distribution A & R Mechanical Contractors, Inc., Urbana Division V — Electrical Downtown Electric, Inc., Urbana Total

Base Bid

86 767

Base Bid

24 475

Base Bid Base Bid

16 800 105 152 $1 318 190

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work (Alt. G - l ) .