216

BOARD OF TRUSTEES

[March 21

gross square feet, and confirmed the need for the total renovation of the football facilities area in the northeast ramp tower. T h e additional new space in the program will provide facilities for academic study, manager locker room, video tape viewing, and additional space for weight training, training, an office, and a visitor/ recruit lounge. On February 22, 1985, the Athletic Association approved the increase in the project and a $4.2 million budget (increased from $2.2 million) and authorized additional planning funds. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the project be increased to $4.2 million and that the agreement between Severns, Rishling & Associates, Inc., and the Board of Trustees be amended to increase the size of the project to provide for a 27,000 gross square foot addition and renovation of the existing 11,300 gross square feet. T h e architect's fixed fee will be $208,500 for the professional design services through the receipt of bids, plus authorized reimbursements and predesign fees of $28,000. Funds are available initially from the restricted-funds operating budget of the Urbana-Champaign campus physical plant with reimbursement from the proceeds of a new bond issue, upon such action being authorized by the board, or from private gift funds held by the University for the benefit of the Athletic Association.

On motion of Mr. Hahn, these recommendations were approved by the following vote: Aye, Mrs. Day, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Mr. Forsyth, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Employment of Engineer, Steam Plant Addition, Boiler Installation, Chicago

(27) The president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of PDS Engineers & Constructors, Inc., Villa Park, for professional engineering services required for a building addition to the Steam Plant, Health Sciences Center, Chicago, and the installation of a used boiler, donated to the University by the A. E. Staley Manufacturing Company, Decatur. The project is to include a building addition for the Steam Plant, approximately 27 by 80 feet and three stories high, to house the unit; electrical work; instrumentation and controls; and installation. For the addition, storage and transportation of equipment to the site, and installation, the total cost is estimated to be $747,500. The engineer will provide the professional services and site supervision required for design engineering, receipt of bids, and construction at a fee based on the firm's hourly rate schedule, not to exceed $177,769 plus reimbursable expenses estimated to be $2,700. Funds are available in the Fiscal Year 1985 restricted-funds operating budget of the Health Sciences Center Steam Plant. A schedule of the firm's hourly rate has been filed with the secretary of the board for record.

On motion of Mr. Hahn, this recommendation was approved by the following vote: Aye, Mrs. Day, Mrs. Gravenhorst, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Mr. Forsyth, Governor Thompson. (Mr. Hahn asked to be recorded as not voting.)