On motion of Mr. Forsyth, this contract was awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Employment of Engineers by the Capital Development Board for Energy Conservation Projects, Chicago and Urbana

(24) On October 18, 1984, the Board of Trustees accepted energy conservation grants totaling $821,027 for academic facilities at the Urbana-Champaign and Chicago campuses under the Cycle V I Federal Energy Conservation for Schools and Hospital Buildings Grants Program. To provide the matching funds required (fifty percent), the eighty-third General Assembly authorized $430,315 for the Urbana-Champaign campus and $390,712 for the Chicago campus. The president of the University, with the concurrence of the appropriate administrative officers, now recommends, subject to availability of funds, that the Capital Development Board be requested to employ the engineering firms identified below to provide the required professional services for the respective projects. T h e fee for each firm will be negotiated in accord with the standard Capital Development Board fee structure for such projects. Project Project Consultant Budget Chicago Health Sciences Center Steam Plant: Oxygen Trim Controls Fluor Engineers, Inc., Chicago $204 790 Steam Pipe Insulation Stanley Howell & Associates, 150 750 Chicago Light Fixtures and Controls Fluor Engineers, Inc., Chicago 43 620 College of Medicine West Tower: Ventilation Controls and Robert E. Morgan & Associates, Double Glazed Windows Deerfield Pharmacy Building: Variable Air-Volume System Klaussen & Associates, Inc., Chicago Building Automation Energy Management & Engineering, Inc., Lombard University Center Utilities Building: Pipe Insulation Stanley Howell & Associates, Chicago Urbana-Champaign Abbott Power Plant: Trap Steam Condensate in Low-Pressure Steam Lines and Steam Generation Efficiency Improvements Roger Adams Laboratory: Variable Air-Volume System Sargent and Lundy, Chicago $519 812 36 105

102 000 152 280

91 880

Buchanan, Bellows & Associates, Bloomington

340 818

On motion of Mr. Forsyth, this recommendation was approved by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none;