274

BOABD OF TRUSTEES

[May 14

for minor building alterations, repairs, new construction, and insulation work at the Urbana campus, for the period July 1, 1987, through June 30, 1988, the awards being made to the low bidders. The University has the option to extend these contracts for an additional year upon the same terms and conditions, subject to approval by the Board of Trustees. The contractors bid on percentages to be added to an estimated volume of material, labor, and subcontractors. The contracts are for individual projects estimated to cost less than $100,000. Percent for Material General Dean Evans Company, Champaign Electrical Downtown Electric Inc., Urbana Plumbing Reliable Plumbing & Heating Co., Champaign Heating, Piping, and Refrigeration Reliable Plumbing & Heating Co., Champaign Percent for Labor Percent for Subcontracts Total Estimated Fee Payments

5.0

39.0

5.0

$121 000

15.0

37.0

3.0

30 300

5.0

46.0

2.0

14 130

5.0

46.0

2.0

32 550

Ventilation and Distribution Systems for Conditioned Air Reliable Plumbing & Heating Co., Champaign 5.0 Plastering E. T. Drewitch, d / h / a E. T. Drewitch Plaster Contractor, Urbana . . . 0.0 Insulation Champaign A & K Insulation Co., Champaign 13.8 Lightning Protection System Midwest Lightning Rods, Decatur

60.0

2.0

24 600

35.0

0.0

33 250

71.9

9.0

29 630

30.0

70.0

6.0

8 020

Funds as required will be covered by a contract work order which will be charged against funds allocated for each project. A schedule of the bids received has been filed with the secretary of the board for record. It is also recommended that the comptroller be authorized to approve work orders under these contracts for projects the cost of which would not exceed the limits established by the Illinois Purchasing Act. O n m o t i o n of M i s s S m i t h , these contracts w e r e a w a r d e d by t h e foll o w i n g v o t e : Aye, M r s . Calder, M r . Forsyth, M r s . Gravenhorst, M r . H a h n ,