1986]

UNIVERSITY OF ILLINOIS

139

A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . M a d d e n , these contracts w e r e a w a r d e d by t h e foll o w i n g v o t e : Aye, M r s . D a y , M r . Forsyth, M r s . Gravenhorst, M r . H o w a r d , M r . L o g a n , M r . M a d d e n , M r s . Shepherd, M i s s S m i t h ; no, n o n e ; absent, Governor T h o m p s o n . ( M r . H a h n asked t o be recorded as n o t voting.) ( T h e student advisory v o t e w a s : Aye, M r . Filip, M r . Starkeson; n o , none.)

Contracts, Sponsored Research Incubator Building, Phase II, Urbana

(21) On October 9, 1986, the Board of Trustees approved the award of construction contracts for the first phase of a Sponsored Research Incubator Building at the Urbana campus. The facility will be used to establish an "incubator" program to foster research and development in advanced technology and service by the College of Agriculture. The first phase consisted of construction of a metal-covered "pole" building. The second phase consists of site grading, interior construction, and associated electrical, plumbing, heating, and air conditioning work. The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for Phase II of the building. The award in each case is to the lowest base bidder plus acceptance of the indicated alternates.1 Base Bid Division I — General W. Commercial Builders, Inc., Champaign Division II — Plumbing A & R Mechanical Contractors, Inc., Urbana Division III — Heating, Piping, Refrigeration, and Temperature Nogle & Black Mechanical, Inc., Champaign Alt. 1 Alt. 2 Total

$169 930

$169 930

43 000

$3 600

46 600

Control 51998 $6 850 58 848

Division IV — Ventilation and Air Distribution Hart & Schroeder Mechanical Contractors, Inc., Champaign . . . . Division V — Electrical Risser Electric, Inc., Danville

22 687 44 280 312

7 920 946

30 607 45 538

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work and that Robert P. Simon and Associates, Champaign, be employed for professional services during the construction phase at a fixed fee of $7,680. The firm will also provide on-site observation on an hourly basis not to exceed $7,200. Funds for this project will be provided by a grant from the State of Illinois Department of Commerce and Community Affairs and from the Fiscal Year 1987 institutional funds budget included in the College of Agriculture. A schedule of the bids received has been filed with the secretary of the board for record.

> A «chedule of the alternates a filed with the secretary of the board for record.