UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 478]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 478 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1979]

UNIVERSITY OF ILLINOIS

467

Amount to Be Paid to the University $ 93 185

With Whom U n i t e d States Department of Transportation DOT-FH-J1-9666 U n i t e d States Navy: N00014-79-C-0752 N0OO14-79-C-0775 T h e University of Chicago, Argonne National Laboratory 31-109-38-5338 T h e University of Wisconsin — Madison T h e University of Wisconsin — Milwaukee 144-N651 Washington University 80-7 Total

Purpose Investigate the potential for development of a national nondimensional triangular hyetograph method to produce local design storms for use in urban storm drainage models Multidimensionality in criterion-referenced tests Research of combinatorial optimization problems Updating and improving the energy input-output data base Assessment of human and organizational resources in Syrian agriculture Region V child abuse and neglect on-site coordinator Medical mycology

250 258 50 254 25 000

12 800 12 037 15 000 $2 954 694

New Contracts

With Whom T h e University of Chicago (subcontract under U . S . O E G0O79O2713) T h e University of Pennsylvania (subcontract under N S F SOC 77-27403) West Virginia University (subcontract under U . S . EPA R805588) Total Latin American program Purpose studies center and fellowship Amount to Be Paid by the University $ 56 230 34 374

Studies in general equilibrium theory and economics of uncertainty Ohio River Basin energy study

the

31 195

t 121 799

Change Orders

With Whom Connecticut, State of PM03 Cornell University PM3 Deere and Company Illinois Pork Producers Association 3 Portland Cement Association State of Illinois, Department of Transportation, Division of Highways: IHR-2 IHR-304 IHR-305 IHR-410 IHR-411 IHR-50B IHR-606 IHR-607 IHR-901 Purpose Provide P L A T O IV terminals and services Provide P L A T O IV terminals and services Perform closed loop strain controlled fatigue testing of 40 cast iron specimens at room temperature Managemen t and environment, and baby pig survival Study of the deformations of a post-tensioned precast segmental concrete bridge to be erected by the cantilever method

Amount to Be Paid to the

University

%

20 000 11 895 5 000 5 500 18 735

Highway problems Steel bridge design criteria t o help minimize the probability of fracture Rehabilitation of bridges in local roads Examine design properties of recycled bituminous shoulders Quality assurance specifications Load response characteristics of flexible pavements Soil-water properties of subgrade soils Subgrade stability implementation package Determination of optimum maintenance procedures and materials for continuously reinforced concrete pavement

12 000 17 000 15 000 36 400 47 500 37 000 6 000 20 000 35 000